Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Addendum No. 2 <br />Project Name: 2024 SB LSL Replacement - West Zone Main and Service Replacement <br />Project Number: 123-069A <br />For Bids Due: Mav 14th, 2024 <br />Contractor Name: Selgp Construction Co., I nC <br />12 Gra _ nivicinn A - 1 aari Aarvira I ina RRniarporP_!lt <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1. <br />Mobilization/Demobilization <br />1 <br />LS <br />$ 60,425.00 <br />$ 60 425.00 <br />2. <br />Maintenance of Traffic <br />1 <br />LS <br />$ 14,500.00 <br />$ 14,500.00 <br />3. <br />Removals and Clearing <br />LS <br />$ 91,250.00 <br />$ 91,250.00 <br />4. <br />Concrete Curb, Remove <br />E48 <br />LFT <br />$ 10.00 <br />$ 12,600.00 <br />5. <br />Concrete Sidewalk, Remove <br />SYD <br />$ 10.00 <br />$ 4,850.00 <br />6. <br />Existing Water Service, Potholing <br />56 <br />EA <br />$ 1,025.00 <br />$ 57,400.00 <br />7. <br />Temporary Erosion and Sediment Control <br />1 <br />LS <br />$ 1,700.00 <br />$ 1,700.00 <br />8. <br />Compacted Aggregate, No. 53, 6" <br />825 <br />SYD <br />$ 30.25 <br />$ 24,956.25 <br />9. <br />HMA for Patching, 8" <br />825 <br />SYD <br />$ 110.00 <br />$ 90,750,00 <br />10. <br />Standard Curb <br />1,260 <br />LFT <br />$ 63,75 <br />$ 80,325.00 <br />11. <br />Concrete Sidewalk, 4" <br />463 <br />SYD <br />$ 80.00 <br />$ 37,040.00 <br />Curb Ramp <br />22 <br />SYD <br />$ 253.50 <br />$ 5,577.00 <br />ff12.Concrete <br />Detectable Warning Surface <br />5 <br />SYD <br />$ 330.00 <br />$ 1,650.00 <br />Water Service, 1", Long Side <br />28 <br />EA <br />$ 9-185-00 <br />$ 257,180.00 <br />15. <br />Water Service, 1 ", Short Side <br />28 <br />EA <br />$ 8,685.00 <br />$ 243.180.00 <br />16. <br />Mulched Seeding, Type U <br />2,150 <br />SYD <br />$ 5.79 <br />$ 12,448.50 <br />17. <br />Street Tree <br />6 <br />EA <br />$ 1,025.00 <br />$ 6,150.00 <br />Base Bid Total <br />(Division A) $ 1,001,981.75 <br />Q� Piet - nivicinn R - Water Main Renlar-ement <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />18. <br />Concrete Curb, Remove <br />40 <br />LFT <br />$ 10.00 <br />$ 400.00 <br />19. <br />Pavement, Remove <br />147 <br />SYD <br />$ 25.00 <br />$ 3,675.00 <br />20, <br />B-Borrow(Undistributed) <br />100 <br />CYD <br />$ 17.25 <br />$ 1,725.00 <br />21- <br />22. <br />Flowable Fill (Undistributed) <br />Compacted Aggregate, No. 53, 6" <br />100 <br />182 <br />CYD <br />SYD <br />$ 130.00 <br />$ 30.25 <br />$ 13,000.00 <br />$ 5,505.50 <br />23. <br />HMA for Patching, 8" <br />55 <br />SYD <br />$ 160.00 <br />$ 8,800.00 <br />24. <br />PCCP for Patching, 8" <br />95 <br />SYD <br />$ 150.00 <br />$ 14,250.00 <br />25. <br />PCCP for Approaches, 6" <br />32 <br />SYD <br />$ 186.75 <br />$ 5.976.00 <br />26. <br />Standard Curb <br />40 <br />LFT <br />$ 63.75 <br />$ 2,550.00 <br />Version 09/29/2021 Contractor's Bid for Public Works - 7 <br />