My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - 2024 Lead Service Line & Main Replacements West Zone Proj No. 123-069A - Selge
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Bids
>
Opening of Bids - 2024 Lead Service Line & Main Replacements West Zone Proj No. 123-069A - Selge
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 11:12:06 AM
Creation date
5/14/2024 3:36:39 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/14/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SLUSSERS <br />SPECIAL CONDITIONS <br />Concerning the Attached Quotation <br />Quote Number: West2024 <br />STANDARD NOTATIONS: <br />1. Special note concerning seeding, Slussees will install seed year-round. However, we will not guarantee <br />seeding performed May 15th through August 15th, and October 1 through March 1. Seeding during this <br />period is very risky due to extreme climatic conditions (heat/drought/cold/etc.) This note does not apply <br />to prairie or wetland seeding unless specified otherwise. <br />2. This quote is valid for a period of 60 days. <br />3. Lawn maintenance to include mowing or spraying is not included in this quotation. <br />4. Topsoil, topsoil placement and any necessary amendments are not included in this quotation. <br />5. Quintities on this quotation are approximate. Areas will be measured and invoiced per unit prices. <br />6. Performance & Payment bonds are available but not included in this quotation. <br />7. Each mobilization to the project for seeding will be invoiced at the unit price shown. <br />8. General Contractor is responsible for determining how many mobilizations will be required for this project. <br />9, Inorganic and Organic soil amendments are not Included in this quotation. <br />10. Clearing, grubbing, removal of rocks, debris and existing vegetation is not included in this quotation. <br />11. Seeding or sodding off right-of-way or outside of the constfuctlon limits is not included in this quotation. <br />12. Mulched Seeding, U partial price includes Indot U seed mix, fertilizer, and straw mulch only. Topsoil, topsoil <br />placement, erosion blanket, or any follow up lawn maintenance is not included in this price. <br />13. Tree price includes supplying and Installing 2.5" Caliper size tree, staking, hardwood bark mulch, tree <br />watering bag, and a 2 year warranty only. Topsoil, planting soil, engineered soil is not included in this price. <br />14. Maintenance or warranty bond for seeding or tree planting is not included in this quotation. <br />15. Optional watering price Is for each time Slusser's is directed to water the new seeded areas only. Contractor <br />to determine the number of watering's for bidding purposes. <br />16. Steel edging or weed barrier is not included in this quotation. <br />17. Soil testing or amended soil is not included in this quotation. <br />18. Indiana State Sales Tax has not been included in pricing. <br />19. Traffic control is the responsibility of the contractoriowner. <br />
The URL can be used to link to this page
Your browser does not support the video tag.