Laserfiche WebLink
SECTION 2 – STREETS, WALKWAYS & PATHS <br />17 <br />construction. Mainline pavement, aside from pavement patches, shall not be colored. <br />Coloring of concrete within portions of individual pours and within separate pou rs throughout a <br />project shall be uniform. Any colored concrete portions deemed by the City to not be uniform will <br />not be accepted. <br />2-5.4 PAVEMENT SECTION <br />For pavement in locations with non-cohesive soils, the minimum concrete pavement section to be <br />used without a unique pavement design, by functional classification, shall be as shown in Standard <br />Drawing 2-11. <br />If cohesive soils are present, a geotechnical investigation is required, addressing both pavement <br />drainage and design. <br />2-5.5 JOINTS <br />Concrete joints shall be placed as indicated in the Standard Drawings and in accordance with <br />Section 503 of the INDOT Standard Specifications, without the use of backer rod. Concrete bicycle <br />facilities will not have tolled joints and shall have saw cut joints only with expansion joints at forty <br />(40)foot intervals. <br />2-5.6 FINISH <br />All concrete pavement shall be tined in accordance with Section 504 of the INDOT Standard <br />Specifications, unless an alternate finish is approved by the City Engineer. Bicycle facilities shall <br />have a broom finish unless approved by the City Engineer. <br />2-6 INCIDENTAL CONSTRUCTION <br />2-6.1 UTILITY CUT PATCHING <br />Chapter 18, Article 2, Division 2 of the Municipal Code, City of South Bend, Indiana states: <br />Whereas: The Board of Public Works deems it necessary to establish a firm policy for the <br />backfilling of excavations and opening or excavations and replacement of pavement disturbed as <br />a result of making an opening or excavation on any street, these specifications are set forth and the <br />compliance therewith shall be a requirement of obtaining a permit for said opening or excavation <br />under chapter 18, Article 2, Excavations, as set forth in the South Bend Municipal Code. <br />It shall be the obligation of any person, firm, or corporation obtaining a permit for an opening or <br />excavation in the public Right-of-Way to backfill the excavation and replace the pavement. <br />All excavations that extend beyond the full pavement depth shall be backfilled with removable, <br />flowable backfill meeting the requirements of INDOT Section 213. Pavement shall be replaced <br />with a type of construction equal to or better than that which is removed, as approved in writing by <br />the City Engineer. <br />If it is not possible for pavement to be replaced within twenty-four (24) hours following backfilling <br />of cut due to weather conditions, a coarse aggregate base eight (8) inches thick and a cold asphaltic