Laserfiche WebLink
20'L=220' Max.L50'*PLAN <br />* Use 50' When Marked Bikeway ends, Otherwise <br />Maintain Constant Symbol Frequency20'Shared <br />Lane <br />Bicycle <br />Lane 100' Min.50' Min.L=220' Max.6/26/18 <br />CITY OF SOUTH BENDItemRevision <br />STANDARD <br />EFFECTIVE DATE: <br />REF STD SPEC SEC <br />APPROVED/REVISED BY THE BOARD OF PUBLIC WORKS <br />STANDARDS FOR DESIGN <br />AND CONSTRUCTION <br />Kara M. Boyles, Ph.D., P.E. Date <br />MARKINGS - BICYCLE LANE AND SHARED LANE MARKINGS 6-13 <br />6-5 <br />June 26, 2018 <br />SECTION 6 - TRAFFIC AND LIGHTING <br />NOTES: <br />1.Shared lane marking is preferred centered in lane. Refer to <br />MUTCD for additional guidance on Shared Lane marking <br />locations. <br />2.Bicycle lane markings should be placed at the beginning of <br />a bicycle lane. <br />3.50 ft. dotted line leading up to intersection may increase up <br />to 200 ft. if bus stop or heavy right turn volume. <br />4.See Standard Drawing 6-12 for Bicycle Symbol & Chevron.