My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10.26.2021-SBN-Standards-Manufacturer-Additions-Minor-Revisions-final
sbend
>
Public
>
Public Works
>
City of South Bend Construction Standards & Specifications
>
10.26.2021-SBN-Standards-Manufacturer-Additions-Minor-Revisions-final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2024 3:44:43 PM
Creation date
5/6/2024 3:43:30 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
City Property
Document Date
5/6/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
254
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Heavy Duty Casting <br />(Refer to Standard 3-5) <br />Precast Conc. Manhole <br />Dia.B-Borrow (Compacted)Varies12" Min.Depth as Req'd.Grade <br />8"Min.1'-0"Max.Adjusting Rings to Bring <br />Frame to Grade (Refer to <br />Standard 3-5) <br />Seal all Joints w/ Conseal CS-102, <br />Bidco C-56 or Approved Equal. <br />Wrap all Joints with Conseal CS-212 <br />Exterior Joint Wrap or Approved <br />Equal. Apply Joint Wrap Primer per <br />Manufacturers Requirements.8" Min.Size as Shown on Plans <br />Pipe Thickness <br />+ (1 2) Dia. + 2" <br />4'-0" Dia. <br />1'-0" Min. Over Highest <br />Entering Pipe <br />PLAN VIEW <br />Precast Manhole Section <br />B-Borrow Backfill Unless Otherwise <br />Required by City Engineer <br />Min. Distance Between Openings shall be 6" <br />for pipe up to 10" Nominal Diam. For Larger <br />Pipes the Min. Distance Between Openings <br />Shall be 1/2 O.D. of Smallest Pipe <br />SECTION VIEW <br />Pre-Cast Base <br />* The Differential Angle of Inlet/Outlet Pipes Shall <br />not be Less Than 90° or Greater Than 270°. <br />** For Larger Pipe Sizes, Provide Pre-Cast Manhole <br />Manufacturer's Sizing Documentation. <br />MANHOLE <br />DIAMETER <br />(INCHES) <br />MAX. NOMINALPIPE SIZE <br />(INCHES) <br />DIFFERENTIAL ANGLE OF <br />INLET/OUTLET PIPES <br />135° - 225°90° - 134° or <br />226° - 270° * <br />48 24 18 <br />60 30 24 <br />72 42 30 <br />84 48** 36** <br />6" <br />Min. <br />6" <br />Min. <br />6" Min. <br />(Typ.)6"Min.4" <br />Min. <br />6" <br />Min.16" O.C.Copolymer polypropylene plastic <br />manhole steps with 1 2" grade 60 <br />reinforcing steel <br />6/26/18 <br />CITY OF SOUTH BENDItemRevision <br />STANDARD <br />EFFECTIVE DATE: <br />REF STD SPEC SEC <br />APPROVED/REVISED BY THE BOARD OF PUBLIC WORKS <br />STANDARDS FOR DESIGN <br />AND CONSTRUCTION <br />Kara M. Boyles, Ph.D., P.E. Date <br />TYPE B MANHOLE (ROUND OR RECTANGLE/SQUARE)3-2 <br />3-2, 3-3 <br />June 26, 2018 <br />SECTION 3 - STORM <br />NOTES: <br />1. All manholes shall be manufactured and installed in compliance with ASTM C-478 <br />(round str.) or ASTM C-913 (rectangle / square str.). <br />2. All pipe connections shall be made with integral resilient fittings complying with ASTM <br />C-923. <br />3. The Design Engineer to be responsible for setting pipe invert elevations to account for <br />minor losses through the manhole.
The URL can be used to link to this page
Your browser does not support the video tag.