My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10.26.2021-SBN-Standards-Manufacturer-Additions-Minor-Revisions-final
sbend
>
Public
>
Public Works
>
City of South Bend Construction Standards & Specifications
>
10.26.2021-SBN-Standards-Manufacturer-Additions-Minor-Revisions-final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2024 3:44:43 PM
Creation date
5/6/2024 3:43:30 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
City Property
Document Date
5/6/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
254
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
GENERAL NOTES: <br />1. Temporary Patch: <br />If it is not possible, due to weather conditions, for the contractor to replace the <br />pavement within 24 hours following backfilling of cut, a coarse aggregate base 8" <br />thick and a cold asphaltic surface of 4" shall be applied and maintained as a <br />temporary patch until permanent repairs can be made. When temperature falls below <br />50°F within 72 hour cure time, concrete to be used shall be 7 bag w/ 2% accelerator. <br />Such temporary patches shall be replaced with permanent repairs no later than May 1 <br />of the following year. <br />2. All utilities must be located prior to making pavement cut. <br />12" Min. <br />all Sides <br />POT HOLING NOTES: <br />1. Maximum pot Hole Diameter of 2 ft., otherwise, asphalt or concrete pavement cut <br />repairs apply. <br />11 <br />2" min. HMA Surface if Asphalt Pavement <br />Applied Over Tack Coat/Binder <br />Concrete <br />Saw Cut for Utility <br />Cuts Req'd. (Typ.) <br />6/26/18 <br />CITY OF SOUTH BEND <br />Item Revision Approved Date <br />STANDARD <br />EFFECTIVE DATE: <br />REF STD SPEC SEC <br />APPROVED/REVISED BY THE BOARD OF PUBLIC WORKS <br />STANDARDS FOR DESIGN <br />AND CONSTRUCTION <br />Kara M. Boyles, Ph.D., P.E. Date <br />PAVEMENT PATCHING AND UTILITY CUTS <br />INVESTIGATIVE POTHOLE REPAIRS 2-50 <br />2-6 <br />June 26, 2018 <br />SECTION 2 - STREETS AND PATHS
The URL can be used to link to this page
Your browser does not support the video tag.