Laserfiche WebLink
Horizontal Surface <br />3.5"6'10'6' <br />Depth of Roadway Pavement <br />(8" Typ.)3.5"Width of Roadway <br />(Excluding Gutter) <br />12"12" <br />GutterGutter <br />Depth of Roadway Pavement <br />(8" Typ.) <br />Direction of Travel <br />Direction of Travel <br />Parabolic Surface <br />(See Detail A) <br />7/20/20 <br />CITY OF SOUTH BEND <br />Item Revision Approved Date <br />STANDARD <br />EFFECTIVE DATE: <br />REF STD SPEC SEC <br />APPROVED/REVISED BY THE BOARD OF PUBLIC WORKS <br />STANDARDS FOR DESIGN <br />AND CONSTRUCTION <br />Kara M. Boyles, Ph.D., P.E. Date <br />DETAILS - SPEED HUMP 2-45 <br />2-2 <br />July 28, 2020 <br />SECTION 2 - STREETS AND PATHS <br />B <br />B <br />PLAN VIEW <br />SECTION A-A <br />SECTION B-B <br />AA <br />Speed Hump <br />Gutter <br />Gutter <br />Face of Curb <br />Face of Curb <br />24" No. 4 Tie Bars <br />@ 36" O.C. <br />18" x 11 4" Dowels <br />@ 12" O.C. <br />NOTES: <br />1. Speed humps should be at least 50 ft. from an uncontrolled intersection and at least <br />200 ft. from a controlled intersection.