Laserfiche WebLink
WCUL-DE-SAC OPEN CENTER <br />WCUL-DE-SAC FULLY PAVED50' Min. R175' <br /> R <br />.50' Min. R175' <br /> R <br />. <br />25' <br />6/26/18 <br />CITY OF SOUTH BENDItemRevision <br />STANDARD <br />EFFECTIVE DATE: <br />REF STD SPEC SEC <br />APPROVED/REVISED BY THE BOARD OF PUBLIC WORKS <br />STANDARDS FOR DESIGN <br />AND CONSTRUCTION <br />Kara M. Boyles, Ph.D., P.E. Date <br />GEOMETRY - CUL-DE-SAC 2-18 <br />2-2 <br />June 26, 2018 <br />SECTION 2 - STREETS AND PATHS