Laserfiche WebLink
9'-0"9'-0" <br />Pavement in Accordance <br />With Latest City Standards <br />20' R/W <br />R/W LineR/W Line1.5% <br />Profile Grade & CL <br />Subgrade <br />1.5% <br />6'-0"6'-0" <br />Pavement in Accordance <br />With Latest City Standards <br />14' R/W <br />R/W LineR/W Line1.5% <br />Profile Grade & CL <br />Subgrade <br />1.5% <br />6/26/18 <br />CITY OF SOUTH BENDItemRevision <br />STANDARD <br />EFFECTIVE DATE: <br />REF STD SPEC SEC <br />APPROVED/REVISED BY THE BOARD OF PUBLIC WORKS <br />STANDARDS FOR DESIGN <br />AND CONSTRUCTION <br />Kara M. Boyles, Ph.D., P.E. Date <br />TYPICAL SECTION - ALLEYWAY 2-10 <br />2-2 <br />June 26, 2018 <br />SECTION 2 - STREETS AND PATHS <br />NOTES: <br />1. Right of Way width in accordance with the approved plat. <br />2. Maximum gradient on alleys shall be 6%. <br />3. Minimum gradient shall be not less than five-tenths of one percent (0.50%). <br />4. Drainage structures shall be placed 10' from approach limits. <br />5. Underground utilities within alleyways shall be located a minimum of 18" below ground. <br />SUBDIVISION <br />URBAN