My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10.26.2021-SBN-Standards-Manufacturer-Additions-Minor-Revisions-final
sbend
>
Public
>
Public Works
>
City of South Bend Construction Standards & Specifications
>
10.26.2021-SBN-Standards-Manufacturer-Additions-Minor-Revisions-final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2024 3:44:43 PM
Creation date
5/6/2024 3:43:30 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
City Property
Document Date
5/6/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
254
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
29'-6"28'-0" <br />2'-0" <br />6'-0" <br />Parkway <br />Grass <br />5'-0" <br />4" Conc. <br />Walk <br />Pavement & Curb in Accordance <br />With Latest City Standards (Standard 2-1) <br />Curb & Gutter 1 2 SectionStandard Curb 1 2 Section <br />80'-120' R/W <br />R/W LineR/W Line1.5%Var.1.5%Var.1.5%1.5%Profile Grade & CL <br />(For Utilities South & West Side)(For Utilities North & East Side) <br />Gas <br />Storm Sewer <br />Grade as Req'd. <br />Sanitary Sewer if in Street <br />Grade as Req'd. <br />Subgrade <br />Top of Curb Elev. <br />Gutter Elev. <br />Top of Curb Elev.Gutter Elev. <br />Elec. <br />Tel. <br />11'-0" <br />Two-Way <br /> Left-Turn Lane <br />11'-0" <br />Travel Lane <br />8'-0" <br />Parking <br />Lane <br />11'-0" <br />Travel Lane <br />8'-0" <br />Parking <br />Lane <br />5'-0" <br />4" Conc. <br />Walk <br />6"3'-0"2'-6"1'-0" <br />6'-0" <br />Parkway <br />Grass 5'-0" <br />Bicycle <br />Lane <br />5'-0" <br />Bicycle <br />Lane <br />Water <br />10'-0" <br />Min. <br />5'-0" Min. <br />6/26/18 <br />CITY OF SOUTH BENDItemRevision <br />STANDARD <br />EFFECTIVE DATE: <br />REF STD SPEC SEC <br />APPROVED/REVISED BY THE BOARD OF PUBLIC WORKS <br />STANDARDS FOR DESIGN <br />AND CONSTRUCTION <br />Kara M. Boyles, Ph.D., P.E. Date <br />TYPICAL SECTION - COMMERCIAL CORRIDOR 2-5 <br />2-2 <br />June 26, 2018 <br />SECTION 2 - STREETS AND PATHS <br />NOTES: <br />1.Where feasible it is recommended that public utilities be installed between the back of <br />the curb and back of sidewalk. <br />2.Right of Way width in accordance with the approved plat. <br />3.Sidewalk width is to be 5 ft. minimum. Parkway may be infilled to curb in commercial <br />zones. No asphalt shall be used for infill. <br />4.Maximum gradient on commercial streets and sidewalks shall be 6%. Minimum gradient <br />shall be not less than five-tenths of one percent (0.50%) at gutter.
The URL can be used to link to this page
Your browser does not support the video tag.