Laserfiche WebLink
City of South Bend - Muessel/Holy Cross Sidewalks <br />Manhour Justification for Design-Bid-Build Project <br />Sidewalk/Curb Ramp Design <br />TTG Project # 22031-00 <br />WORK ITEM Senior Project <br />Manager <br />Executive <br />Director of <br />Transportation <br />Civil Engineer <br />Project <br />Manager <br />Civil Project <br />Engineer <br />Civil <br />Engineering <br />Assoc. <br />Clerical Landscape <br />Architect Total Labor <br />Labor Code A T P 5 6 EM L <br />Allowable Billing Rate $128.21 $123.14 $102.57 $87.99 $75.08 $45.75 $117.13 <br />Scope Analysis <br />Project Management 0 <br />Quarterly Reports 0 <br />Field Reconnaissance 0 <br />Assemble findings 0 <br />Meet with Schools, including preparation 0 <br />Assemble initial report 0 <br />Exhibits 0 <br />QA/QC 0 <br />Address Comments 0 <br />Submit Assessment to the City 0 <br />Meet with City of South Bend 0 <br />Mark-Ups from mtg w/ City - Final Report 0 <br />Man Hours Subtotal 0 0 0 0 0 0 0 0 <br />Negotiated Labor Rate $128 $123 $103 $88 $75 $46 $117 <br />Labor Cost $0 $0 $0 $0 $0 $0 $0 $0 <br />Storm Water General Permit (SWGP) <br />Coordination 1 2 2 5 <br />Project Map 1 1 <br />Narrative 3 3 <br />Project Location Elements (Proposed improvements, utilities, etc)2 2 <br />Building Locations within project limits 2 2 <br />Land use adjacent to project areas 2 2 <br />Existing Vegetation (Identify/Delineate)2 2 <br />Location/Name of all wetlands, lakes, water courses 2 2 <br />100 year floodplains, floodway fringes, and floodways 1 1 <br />Soils Information 1 1 <br />Existing and planned contours 8 8 <br />Location where off-site drainage will enter the project area 6 6 <br />Location of specific points where stormwater discharge will leave site 6 6 <br />Identify all receiving waters 1 1 <br />Potential areas where stormwater may enter groundwater 2 2 <br />Location of stormwater system 3 3 <br />Location and approximate dimensions of disturbed areas 3 3 <br />Monitoring and maintenance guidelines (INDOT Standard Specs)1 1 <br />Temporary Seeding Standard Specifications retrieval 0 <br />Temporary erosion and sediment control measures 2 1 3 <br />Permanent erosion and sediment control measures 2 1 3 <br />Storm drain inlet protection 4 4 <br />Storm drain outlet protection 4 4 <br />NOI Form 2 2 <br />QC / QA 4 2 6 <br />MS4 Submittal (Electronic Only)2 <br />INDOT Submittal <br />NOI Approval 1 <br />NOS Approval 1 <br />Final Assembly of Rule 5 (Application, NOI, NOS)1 2 <br />Man Hours Subtotal 1 11 66 2 0 0 0 80 <br />Negotiated Labor Rate $128 $123 $103 $88 $75 $46 $117 <br />Labor Cost $128 $1,355 $6,770 $176 $0 $0 $0 $8,428 <br />Preliminary Field Check <br />Project Management 0 <br />Field Check Notification 0 <br />Attendance and preparation 0 <br />Meeting Minutes 0 <br />Resolution to Field Check Comments 0 <br />Man Hours Subtotal 0 0 0 0 0 0 0 0 <br />Negotiated Labor Rate $128 $123 $103 $88 $75 $46 $117 <br />Labor Cost $0 $0 $0 $0 $0 $0 $0 $0 <br />Stage 3 Submission <br />Project Management 16 16 <br />Quarterly Reports 12 12 <br />Review Stage 1 Comments 0 <br />Conformance 0 <br />Typical Sections 0 <br />Curb Ramp Design 0 <br />Sidewalk Design 0 <br />Plan Sheets 0 <br />Title Sheet 0 <br />Index and General Notes Sheet 0 <br />Pedestrian MOT 0 <br />Plan Sheets 0 <br />Appendix A1