Laserfiche WebLink
Contract No:R -38065 INDIANA Date:03/26/2024 <br />Change Order No:003 Department of Transportation Page: 4 <br />Supplemental Description2: <br />0102 1401811 0102 802-05704 LFT 30.000 90.000 C Amount:$ 2,700.00 <br />Item Description:SIGN POST SQ 1 UNREINFORCED ANCHOR BASE <br />Supplemental Description1: <br />Supplemental Description2: <br />0103 1401811 0103 802-07057 SFT 50.000 64.000 C Amount:$ 3,200.00 <br />Item Description:SIGN PANEL WITH LEGEND <br />Supplemental Description1: <br />Supplemental Description2: <br />0104 1401811 0104 621-06570 CYS 275.000 11.500 C Amount:$ 3,162.50 <br />Item Description:TOPSOIL <br />Supplemental Description1: <br />Supplemental Description2: <br />0105 1401811 0105 621-06574 SYS 13.700 68.000 C Amount:$931.60 <br />Item Description:SODDING <br />Supplemental Description1: <br />Supplemental Description2: <br />0106 1401811 0106 105-06807 LS 14,261.140 1.000 C Amount:$ 14,261.14 <br />Item Description:ADDITIONAL <br />Supplemental Description1: Added Labor and Material for Existing Utility Conflict for <br />Supplemental Description2: Post Installation <br />Total Value for Change Order 003 = $ 113,661.86 <br />Milestone Time Adjustment <br />MileStone Nbr: 01 <br />Milestone Description: CSGP INTERMEDIATE COMPLETION DATE <br />Original Completion dt: 09/01/2023 Adj compl dt 02/07/2024 Adj No. of Days 159 <br />Explanation:City requested addition of guardrail as a non participating change order. Contract intermediate completion date was <br />extended to complete all work provided. This was an unplanned addition and therefore took a longer amount of time to <br />precure all materials needed. <br />Whereas, the Standard Specifications for this contract provides for such work to be performed, the following change is recommended. <br />General or Standard Change Order Explanation <br />This change order includes multiple items for the addition of guardrail added by the request of the city. The guardrail is being replaced on Angela <br />Blvd adjacent to the trail. All items are non-participating. The item Additional LS was added in order to complete the guardrail installation on the <br />north side of Angela Rd. due to a conflict with an exisitng gas line. All post holes had to be excavated with a vac truck. As the post holes were <br />excavated, many locations had existing pavement in direct conflict with the post hole. The pavement located in conflict had to be jack hammered <br />out and the vac truck then continued to excavate the hole to the proper depth. Flowable fill was requierd for backfill for the guardrail posts. There <br />was Time is being added to milestone 1 to cover the additional work, and the PM has been notified. <br />Change Order Explanation for Specific Line Item <br />**************************************************************************************************************************** <br />It is the intent of the parties that this change order is full and complete compensation for the work describe above. <br />Notification and consent to this change order is hereby acknowledged. <br />Contractor:____________________________________________Signed By:_____________________________________________ <br />Date:__________________________________________________ <br />***************************************************************************************************************************