Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Addendum No. 1 <br />Project Name: <br />Downtown South Bend to Notre Dame Trail - Hill St. and South Bend Ave. <br />rr <br />Project Number: <br />122-040B: <br />For Bids Due: <br />4/9/2024 a, 9:00 am <br />WWI <br />Contractor Name: <br />Rieth-Riley Construction Co., Inc." <br />Base Bid <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1. <br />Construction Engineering <br />1 <br />LS <br />$42,000.00 <br />$42,000.00 <br />2. <br />Mobilization/Demobilization <br />1 <br />LS <br />$98,498.53 <br />$98,498.53 <br />3. <br />Maintenance of Traffic <br />1 <br />LS <br />$33,186.46 <br />$33,186.46 <br />4. <br />Erosion Control <br />1 <br />LS <br />$4,529.68 <br />$4,529.68 <br />5. <br />Clearing Right of Way <br />1 <br />LS <br />$19,830.27 <br />$19,830.27 <br />6. <br />Railroad Ties, Remove <br />1,500 <br />LFT <br />$16.66 <br />$24,990.00 <br />7. <br />Common Excavation <br />4,550 <br />CYD <br />$42.23 <br />$192,146.50 <br />8. <br />B Borrow <br />1,650 <br />CYD <br />$34.33 <br />$56,644.50 <br />9. <br />Structure Backfill, Undistributed <br />500 <br />CYD <br />$48.50 <br />$24,250.00 <br />10. <br />Tree, 6", Remove <br />1 <br />EA <br />$400.00 <br />$400.00 <br />11. <br />Tree, 10°,Remove <br />4 <br />EA <br />$600.00 <br />$2,400.00 <br />12. <br />Tree, 18",Remove <br />6 <br />EA <br />$800.00 <br />$4,800.00 <br />13. <br />Tree, 30", Remove <br />1 <br />EA <br />$2,000.00 <br />$2,000.00 <br />14. <br />Sign, Remove <br />21 <br />EA <br />$50.00 <br />$1,050.00 <br />15. <br />Sign, Relocate <br />4 <br />EA <br />$75.00 <br />$300.00 <br />16. <br />Light Pole, Remove <br />15 <br />EA <br />$300.00 <br />$4,500.00 <br />17. <br />Pipe, Remove <br />4,585 <br />LFT <br />$26.13 <br />$119,806.05 <br />18. <br />Structures, Remove <br />28 <br />EA <br />$421.84 <br />$11,811.52 <br />19. <br />Fire Hydrant, Remove <br />5 <br />EA <br />$738.21 <br />$3,691.05 <br />20. <br />Concrete Curb, Remove <br />5,565 <br />LFT <br />$8.02 <br />$44,631.30 <br />21. <br />Concrete Approaches and Sidewalk, Remove <br />3,315 <br />SYD <br />$9.74 <br />$32,288.10 <br />22. <br />Concrete Pavement, Remove <br />6,820 <br />SYD <br />$16.01 <br />$109,188.20 <br />23. <br />Brick, Remove and Salvage <br />1,345 <br />SYD <br />$9.26 <br />$12,454.70 <br />24. <br />Compacted Aggregate, No. 53 <br />5,110 <br />TON <br />$38.21 <br />$195,253.10 <br />25. <br />Item Omitted <br />26. <br />HMA for Patching <br />10 <br />TON <br />$412.50 <br />$4,125.00 <br />27. <br />HMA Surface, 9.5 mm - Type B, PG 70-22P <br />810 <br />TON <br />$112.00 <br />$90,720.00 <br />28. <br />HMA Intermediate, 12.5 mm - Type B, PG 64-22 <br />1,340 <br />TON <br />$90.00 <br />$120,600.00 <br />29. <br />HMA Base, 25 mm - Type B, PG 64-22 <br />3,200 <br />TON <br />$75.00 <br />$240,000.00 <br />30. <br />Tack Coat <br />2.7 <br />TON <br />$548.00 <br />$1,479.60 <br />Version 09/29/2021 Contractor's Bid for Public Works - 7 <br />