Laserfiche WebLink
BID/PROPOSALH <br />CITY OF SOUTH BEND <br />!x <br />. 1G5 J <br />PROJECT NAME: 2024 Community Crossings <br />PROJECT NO. 124-006 <br />FOR BIDS DUE: March 26, 2024, 9:00am, Local Time <br />CONTRACTOR NAME: Milestone Contractors. L.P. <br />Item <br />BENDIX DRIVE (WESTMOOR ST TO ECLIPSE PL) <br />No. <br />DESCRIPTION <br />UNIT PRICE <br />QUANTITY <br />UNIT <br />TOTAL AMOUNT <br />Transverse Marking, Thermoplastic, <br />15 <br />Crosswalk Line, White, 6 IN. <br />450 <br />LFT <br />5.00 <br />$2,250.00 <br />Pavement Message Marking, <br />16 <br />Thermoplastic, Lane Indication Arrow <br />3 <br />EA <br />200.00 <br />$600.00 <br />Pavement Message Marking, <br />17 <br />Thermoplastic, Bike and Arrow Symbol <br />17 <br />EA <br />400.00 <br />$6,800.00 <br />18 <br />Grooving for Pavement Markings <br />6950 <br />LFT <br />1.25 <br />$8,687.50 <br />19 <br />Detector Housing, Replace <br />1 <br />EA <br />1,700.00 <br />$1,700.00 <br />Pedestrian Push Button Pole, Pedestal, 12 <br />20 <br />4 <br />EA <br />1,400.00 <br />$5,600.00 <br />Pedestal Foundation, A, 24 IN. X 24 IN. X <br />21 <br />36IN. <br />4 <br />EA <br />1,100.00 <br />$4,400.00 <br />Pedestrial Signal Head, <br />22 <br />International Symbol, 18 IN., with <br />Countdown <br />4 <br />EA <br />819.00 <br />$3,276.00 <br />Pedestrian Push Button & Sign R10-8 & <br />23 <br />APS Audible Conformation <br />12 <br />EA <br />1,600.00 <br />$19,200.00 <br />24 <br />Conduit, HDPE SCH. 80, 2 IN. <br />300 <br />LFT <br />32.00 <br />$9,600.00 <br />25 <br />Conduit, PVC SCH. 40, 2 IN. <br />100 <br />LFT <br />17.00 <br />$1,700.00 <br />Signal Cable, Control, Copper, 5C/14 GA <br />26 <br />300 <br />LFT <br />4.50 <br />$1,350.00 <br />27 <br />Handhole, Adjust to Grade <br />2 <br />EA <br />400.00 <br />$800.00 <br />28 <br />Manhole, Structure Adjustment <br />3 <br />EA <br />940.00 <br />$2,820.00 <br />29 <br />Inlet, Structure Adjustment <br />2 <br />EA <br />940.00 <br />$1,880.00 <br />30 <br />Water Valve, Structure Adjustment <br />4 <br />EA <br />65.00 <br />$260.00 <br />31 <br />Maintenace of Traffic <br />1 <br />13,171.14 <br />$13,171.14 <br />32 <br />Mobilization and Demobilization <br />1 <br />LS <br />16,400.00 <br />$16,400.00 <br />r- <br />DIVISION 3 TOTALI <br />$514,700.00 <br />Version 09/29/2021 Contractor's Bid for Public Works - 12 <br />