Laserfiche WebLink
Page 1 <br />(Exhibit K – (Amendment to Owner-Engineer Agreement) – Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />This is EXHIBIT K, consisting of 3 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated December 14, 2021. <br /> <br />AMENDMENT TO OWNER-ENGINEER AGREEMENT <br />Amendment No. __1__ <br /> <br />1. Background Data: <br /> <br />a. <br /> <br />Effective Date of Owner-Engineer Agreement: <br /> <br />December 14, 2021 <br /> <br />b. <br /> <br />Owner: <br /> <br />City of South Bend, Indiana <br /> <br />c. <br /> <br />Engineer: <br /> <br />Jones Petrie Rafinski <br /> <br />d. <br /> <br />Project: <br /> <br />Lasalle and Colfax Ave Streetscapes <br /> <br />2. Description of Modifications: <br />[NOTE TO USER: Include the following paragraphs that are appropriate and delete those not applicable to <br />this amendment. Refer to paragraph numbers used in the Agreement or a previous amendment for clarity <br />with respect to the modifications to be made. Use paragraph numbers in this document for ease of <br />reference herein and in future correspondence or amendments.] <br /> <br />a. Engineer shall perform or furnish the following Additional Services: <br />1) Lasalle Ave Streetscape Additions <br />a) Additional Survey Tie-in $10,000 <br />b) Rework, Shifting Riverwalk Trail Crossing locations $25,115 <br />c) Lasalle Rebid Documents $30,000 <br />d) Lighting Updates and Footing Design, MOT Plan Changes and Updating <br />furnishing locations after removal from rebid $4,687.50 <br />e) Riverwalk Trail Crossing and Bridge Detailing $6,137.50 <br />f) Storm Drain Revisions to eliminate Structures $1,990 <br />g) Construction Admin for Spring Completion $3,200 <br />h) Items a-g changes total: $81,130 <br /> <br />2) Colfax Ave Streetscape <br />a) Additional Pavement Cores for Brick Material $7,500 <br />b) Utility Potholing $8,500 <br />c) Updated hourly and proposed time including: $74,325 <br />i. Bridge Coordination with DLZ <br />ii. Intersection Improvements at MLK Blvd and Colfax <br />iii. Sanitary Sewer Replacement <br />d) Items a-c changes total: $90,325 <br />