Laserfiche WebLink
vi ::::; <br />PROJECT: <br />,-J MPLE ST. <br />roject <br />Location <br />en <br />□SEWER <br />� <br />� <br />AUTEN RD <br />INWOOD ROAD <br />;:i:: <br />� <br />� IR ND ROAD <br />EDISON RD. <br />McKINLEY HWY. <br />BLVD. <br />WATER <br />BRICK RD <br />� <br />� <br />� ��---t---------j � <br />f.-. VJ <br />U.S. 20 <br />Q:: vi <br />CITY OF SOUTH BEND, INDIANA, PREVAILING SPECIFICATIONS LATEST EDITION, <br />TO BE USED WITH THESE PLANS. <br />' <br />□TRAFFIC □STREET □OTHER <br />2024 LEAD SERVICE LINE AND <br />ELIZABETH A. MARADIK <br />JOSEPH R. MOLNAR <br />MAIN REPLACEMENTS <br />SOUTH EAST ZONE <br />CITY PROJECT NO. 123-0698 <br />APPROVED BY <br />BOARD OF PUBLIC WORKS <br />DATE <br />PRESIDENT <br />VICE PRESIDENT <br />RECOM MENDED BY <br />CITY STAFF <br />KARA BOYLES, Ph.D., P.E. <br />RE BECCA PLANTZ, P.E. <br />DATE <br />CITY ENGINEER <br />SENIOR ENGINEER <br />GARY A. GILOT MEMBER MATTHEW BUSSELL DIRECTOR OF WATER WORKS <br />MURRAY L. MILLER <br />BREANA N. MICOU <br />THERESA M. HEFFNER <br />TABLE OF CONTENTS <br />See Index Sheet <br />-•ABONMARCHE <br />315 Jefferson Boulevard <br />South Bend, IN, 46601 r 57 4.232.8700 F 574.251 .4440 <br />abonmarche.com <br />Battle Creek Goshen Benton Harbor Hobart <br />Lafayette South Haven <br />South Bend Valparaiso <br />cOPYR1G1-11 2021 ABONw.�cfE cor-1suLT11NTs, 1Nc. Engineering ·Architecture· Land Surveying <br />MEMBER KYLE LUDLOW <br />MEMBER <br />CLERK <br />PLANS PREPARED FOR: <br />City of South Bend <br />County-City Building, Suite 1400 S., 227 West Jefferson Boulevard South Bend, Indiana 46601 <br />CONSTRUCTION MANAGER <br />STANDARD DRAWINGS <br />See Project Specifications <br />04/05/2024 <br />CHAD A. KNIP DATE <br />PROFESSIONAL ENGINEER NO. PE10300102 <br />04/01/2024 <br />4/1/24