My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PCA - MPAC Guaranteed Energy Savings Contract Proj No. 121-030 - Ameresco, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Project Completion Affidavits
>
PCA - MPAC Guaranteed Energy Savings Contract Proj No. 121-030 - Ameresco, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 3:25:28 PM
Creation date
4/9/2024 3:25:09 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/9/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AMERESO <br />Green . Clean . Sustainable <4 <br />Warranty Reference Chart <br />Customer Name and Address: Project Title: Guaranteed Energy Saving <br />City of South Bend Ens!and Infrastructure <br />Upgrades <br />219 S St. Luis Blvd <br />South Bend, IN 46617 Project #: 33433 <br />Start <br />Sub-Proiect Tasks nn4a Fna n.+.. <br />ECM-11 Boiler Replacement <br />9/20QO22 <br />8i1012024 <br />ECM-1 Pump Replacement <br />8/1/2022 <br />8/1/2023 <br />ECM-2 AHU-4 Replacement <br />4/10/2023 <br />41012024 <br />ECM-3 RTU Replacement <br />8/1212022 <br />$112/2027 <br />ECM-3 MAU Replacement <br />3/2212023 <br />3/2212024 <br />ECM4 Heatpump Control Upgrades <br />1212/2022 <br />12=023 <br />ECM-6 Now Building Automation System <br />611/2023 <br />6/1/2024 <br />ECM-6 Plumping Fixture Replacement <br />3/30/2022 <br />3/30/2023 <br />ECM-7 Roofing Replacement <br />1011312022 <br />10113/2042 <br />ECM-8 Fire Alarm System Replacement <br />1215/2023 <br />12/512024 <br />ECM-9 LED Lighting Upgrade <br />4/1212023 <br />411212024 <br />This warranty chart serves as a general reference for the equipment installed as part of the contract. Please refer to the following <br />'ee (3) locations for specific warranty information: Subcontractor's warranty letters, equipment manufacturer's literature, and the <br />iergy Management Services Agreement between Ameresco and the City of South Bend_ <br />2. Ameresco, Inc. should be the initial point of contact for all warranty issues. <br />
The URL can be used to link to this page
Your browser does not support the video tag.