Laserfiche WebLink
Page 1 of 1 <br /> <br /> <br /> <br />INTER-OFFICE MEMORANDUM <br /> <br /> DEPARTMENT OF PUBLIC WORKS <br /> DIVISION OF ENGINEERING <br />TO: Theresa Heffner, Clerk <br />Board of Public Works <br />FROM: Zach Hurst, PE, Sr. Project Engineer <br /> <br />SUBJECT: Change Order No. 4 - Project No. 122-034 <br />Fire Station #8 Replacement <br />DATE: 04/02/2024 <br /> <br />Change Order No. 4 for the subject project addresses the following items: <br /> <br />• Column Wrap Modification: $2,829.00 <br />o This is an omission from the Plans. Column wrap details were not included. <br />• Added Downspout Work: $9,160.00 <br />o Design errors required re-routing of downspout system. <br />• Revise Sanitary Sewer Connection: $23,425.00 <br />o Design errors required re-routing of sanitary sewer line to avoid tree. <br />• Kitchen/Quiet Room Changes: ($1,574.67) <br />o This is a credit due to owner-initiated scope changes to change room layout. <br />• Exterior Fans: $3,355.00 <br />o This is an owner-initiated scope change to install three (3) outdoor fans at the <br />front and rear of the firehouse. <br />• Dryer Exhaust Deduct: ($1,900.00) <br />o This is a deduct for an un-needed separated exhaust system for the gear dryer. <br />• Dryfall Apparatus Bay: $7,367.00 <br />o This is a plan omission. Exposed roof trusses in the Apparatus Bay require a <br />dryfall (quick-dry) painting application. <br />• Flag Pole and Light: $4,587.00 <br />o This is a plan omission. Architect neglected to include flag pole and light. <br />• Firewall Framing: $3,221.00 <br />o This is a plan omission. Added framing needed for firewall in overbuild trusses. <br /> <br />• TOTAL: $50,469.33 <br /> <br />This change order does not affect the existing contract completion date of September 19, 2024. <br /> <br />Funding for this change order is available through the Fire Department’s capital fund. <br /> <br />