My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1 - South Well Field WWTP & Dist. System Imprvmts. - Contract B -Watermain Proj No. 117-059B - C&E
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Change Orders
>
Change Order No 1 - South Well Field WWTP & Dist. System Imprvmts. - Contract B -Watermain Proj No. 117-059B - C&E
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 3:24:09 PM
Creation date
4/9/2024 3:23:58 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/9/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />INTER-OFFICE MEMORANDUM <br /> <br /> DEPARTMENT OF PUBLIC WORKS <br /> DIVISION OF ENVIRONMENTAL SERVICES <br /> <br /> <br />TO: Members of the Board of Public Works <br />Michael Schmidt, Assistant City Attorney Public Works <br />Theresa Heffner, Clerk <br />FROM: Jacob M. Klosinski, P.E., Assistant City Engineer <br />SUBJECT: 117-059B South Well Field Water Treatment Plant and Distribution <br />System Improvements – Contract B – Water Main (PROJ00000082) <br />Agenda Request – Change Order No. 1 <br />DATE: April 1, 2024 <br /> <br />The Division of Engineering and Division of Water are issuing this Agenda Request for the Board of <br />Public Works approval of Change Order No. 1 for Project No. 117-059B South Well Field Water <br />Treatment Plant and Distribution System Improvements – Contract B – Watermain. Described, <br />herein, are the additional scope of work items: <br /> <br />Change Order No. 1 – Description of Additional Scope Items <br /> <br />Item 1: Addition of Water Main Insulation at Chippewa Avenue <br />Reason: Unforeseen condition. Existing utilities were discovered to be closer than anticipated <br />requiring a shallower watermain profile through a portion of Chippewa Avenue. <br /> <br /> Item 1 Cost: $10,251.95 See attachment for detail. <br /> <br />Item 2: 24-inch Water Main Repair <br />Reason: Unforeseen condition. During excavation activities at the South Well Field property, a <br />leaking corporation stop and valve were discovered to be leaking beyond the contractor’s <br />excavation. Exploratory excavation uncovered leaking valve and C&E Excavating assisted with the <br />corporation stop replacement since Water Works crews were unavailable due to City crews <br />responding to other water main breaks. <br /> <br /> Item 2 Cost: $ 7,594.70 See attachment for detail. <br /> <br />Item 3: Addition of two (2) 16-inch diameter ductile iron 22.5-degree fittings <br />Reason: Unforeseen condition. The two additional 16-inch ductile iron water main 22.5-degree <br />fittings were required to adjust the vertical profile of the water main at the South Well Field property. <br />Actual depth of the water main differed from the anticipated water main profile. <br /> <br /> Item 3 Cost: 2 x $2,700.00 each = $5,400.00 See attachment for detail. <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.