My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Fellows Booster Pump Station Improvements - Contract A Proj No. 121-070A - EFI-Solutions Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Bids
>
Opening of Bids - Fellows Booster Pump Station Improvements - Contract A Proj No. 121-070A - EFI-Solutions Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 1:33:10 PM
Creation date
4/9/2024 3:16:42 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/9/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
FACTORY START-UP AND SERVICE STATEMENT <br />Start-up Cl"d warranty service shall be performed by the booster pumping system manufacturer factory <br />direct employees. No representative, contract service organization or third party of any sort shall be <br />directed to perform such services by the booster pumping system manufacturer. <br />1. Start-up and warranty service technicians shall be regular factory direct employees. <br />2. At least one of the following factory direct employees will perform all services and warranty <br />work as required on the booster pump station: <br />EMPLOYEE NAME POSITION YEAR OF SERVICE <br />CHARLES WAGGONER SERVICE MANAGER <br />CODY KEEN <br />SCOTT MOORE <br />ASST. SERVICE MANAGER <br />SERVICE TECHNICIAN <br />SERVICE TECHNICIAN <br />32 <br />22 <br />LINCOLN DICKINSON SERVICE TECHNICIAN 05 <br />3. One (1) or more of the Service Technicians listed above will perform the required start-up <br />and warranty service on the booster pumping system. <br />4. A total of two (2) days for start-up and training on site shall be provided. <br />5. Start-up service to include two (2) bound O&M Manuals for the booster pumping system <br />and one (1) SSD drive with all O&M Manual and approved submittal documents. <br />6. All start-up or service reports shall be attested to by start-up technician and representatives <br />of Owner or Engineer. <br />7. Service reports shall be distributed to: <br />a. Manufacturer's File <br />b. Engineer's File <br />c. Contractor's File <br />d. Owner's File <br />Dated: APRIL 8, 2024 <br />State of ILLINOIS <br />County of MA ION <br />EFI-SOLUTIONS <br />Company Name <br />Company Officer's Sign <br />The above FACTORY START-UP AND SERVICE STATEMENT was signed and acknowledged <br />before me on this 8TH day of APRIL 2024 by DAVID A. EALY (Officer), acting in the <br />aforesaid capacity for EFI-SOLUTIONS. INC.(Company), <br />Notary Public -_ <br />Official Seal <br />Gina Marie Faster <br />Notary Public State of Illinois <br />My Commission Expires 2/2612026 <br />Seller's Proposal for Public Works 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.