My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - HVAC System at Studebaker Museum Proj No. 124-020 – ME Design Services
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Agreements/Contracts/Proposals/Addenda
>
PSA - HVAC System at Studebaker Museum Proj No. 124-020 – ME Design Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2025 4:03:12 PM
Creation date
3/26/2024 3:57:59 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
3/26/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
identify and, as appropriate, abate, remediate, or remove the Hazardous Environmental Condition; <br />and (2) warrants that the Site is in full compliance with applicable Laws and Regulations. <br />Owner and Engineer agree to negotiate each dispute between them in good faith during the 30 days <br />after notice of dispute. If negotiations are unsuccessful in resolving the dispute, then the dispute <br />shall be mediated. If mediation is unsuccessful, then the parties may exercise their rights at law. <br />6.01 Total Agreement <br />A. This Agreement (including any expressly incorporated attachments), constitutes the entire <br />agreement between Owner and Engineer and supersedes all prior written or oral understandings. <br />This Agreement may only be amended, supplemented, modified, or canceled by a duly executed <br />written instrument. <br />,-o Basis ofz--q�rrretrEutrrpSum <br />Using the faAh in Paragraph 2.01, Owner- <br />follows,A. <br />pa�, Engineer- as <br />pfeeedtir-es set shall <br />1. A bump Sum $ <br />amount o <br />B. The pai4ien of the eempens4ion amethi# billed mentWy faf <br />Engineer's sefviees will be based up <br />7.01 Basis of Payment —Hourly Rates Plus Reimbursable Expenses <br />A. Using the procedures set forth in Paragraph 2.01, Owner shall pay Engineer as follows: <br />1. An amount equal to the cumulative hours charged to the Project by each class of Engineer's <br />employees times standard hourly rates for each applicable billing class for all services <br />performed on the Project, plus reimbursable expenses and Engineer's consultants' charges, <br />if any. <br />2. Engineer's Standard Hourly Rates are attached as Appendix 1. <br />3. The total compensation for services and reimbursable expenses is estimated to be <br />$2000.00. <br />FIRMIMMOMMEFFM MI. <br />Page 5 <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.