My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 3 - MLK Jr. Dream Center Proj No. 121-066 - C.H. Garmong & Sons, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Change Orders
>
Change Order No 3 - MLK Jr. Dream Center Proj No. 121-066 - C.H. Garmong & Sons, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2024 3:52:14 PM
Creation date
3/26/2024 3:52:02 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
3/26/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> DATE: March 8, 2024 <br /> <br /> TO: Garmong Construction <br /> <br /> ATTN: Josh Springer <br /> <br /> FROM: Justin Baird <br /> <br /> QUOTE: MLK Dream Center <br /> <br /> PROJECT LOCATION: South Bend Indiana <br /> <br /> D.A. Dodd, LLC. is pleased to submit the following Proposal for your consideration price is valid for 60 days. <br /> <br />At this time, the full schedule impact of this Change cannot be ascertained. Therefore, we reserve the right for an extension to our schedule <br />and associated costs. <br /> <br /> <br /> INCLUSIONS: <br />a) Furnish (1) total drinking fountain. <br />b) Labor to install drinking fountain. <br />c) Optional concrete anchor template included. <br />d) Domestic water connection to be provide above slab/grade. <br /> <br /> PRICING: <br />a) BASE BID: these items for the sum of…………………………………………..……$10,442.00 <br /> <br />EXCLUSIONS: <br />a) Winterization <br />b) Concrete <br />c) Any additional valving for fountain <br />d) Any additional filters needed <br />e) Utilities provided and installed by others <br />f) Sanitary draining gravel <br />g) Equipment or housekeeping pads <br />h) Coordination drawings (BIM modeling also excluded) <br />i) Premium time labor <br /> <br /> <br /> Sincerely, <br /> Justin Baird <br /> Project Manager <br /> Office: (219) 778-4302 <br /> Cell: (765) 650-0113 <br /> Email: justinbaird@dadodd.com <br /> <br /> <br /> <br />D.A. Dodd, LLC <br />14 E. Michigan Street, P.O. Box 430, Rolling Prairie, IN 46371 – Phone (219) 778-4302 / FAX (219) 778-2981 <br /> 2516 N. Home Street, Mishawaka, IN 46545 – Phone (574) 968-0589 / Fax (574) 968-0590 <br />DocuSign Envelope ID: 77150BD8-9635-4710-AF60-406232008C44
The URL can be used to link to this page
Your browser does not support the video tag.