My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 3 - MLK Jr. Dream Center Proj No. 121-066 - C.H. Garmong & Sons, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Change Orders
>
Change Order No 3 - MLK Jr. Dream Center Proj No. 121-066 - C.H. Garmong & Sons, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2024 3:52:14 PM
Creation date
3/26/2024 3:52:02 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
3/26/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />2019, 2023 Musco Sports Lighting, LLC Date: Jan. 12, 2024 Project #231697, Page 4 of 4 <br /> M-3219-en04-10 <br />Quote Scope of Work: Light-Structure System™ - Pole in the Air <br />i. Jobsite shall be policed daily for compliance to the above conditions. <br />j. Subcontractor’s employees and agents are prohibited from using drugs and alcohol on the Project <br />property or being under the influence of alcohol or drugs while performing work on the Project. <br />Anyone observed participating in or observed under the influence will be removed from the Project <br />immediately and prohibited from returning, with no exceptions. <br /> <br />2. CONFORMANCE TO STANDARD MUSCO INSTALLATION GUIDELINES. <br />a. Review and understand installation instructions are provided with every product installation. <br />b. Education of installation personnel to allow for highest efficiency and lowest possibility of failure. <br />c. Verify that components have been assembled per Musco installation instructions. <br />d. Verify plumb of concrete foundations prior to standing of poles. <br /> <br />3. PROVIDING A QUALITY INSTALLATION TEAM. <br />a. Subcontractor’s work directly reflects the quality of the installation and may indirectly relate to the <br />quality of the product upon which Musco’s reputation is built. <br />b. Provide and maintain quality installation equipment. Records of maintenance and/or calibration <br />shall be provided upon request. <br />c. Personnel shall be knowledgeable in operation of equipment as well as installation of Musco <br />product. <br />d. All personnel provided by Subcontractor shall understand the relationship developed by and <br />between Subcontractor and Musco, also by and between Musco and the customer, and act <br />accordingly. <br /> <br />DocuSign Envelope ID: 77150BD8-9635-4710-AF60-406232008C44
The URL can be used to link to this page
Your browser does not support the video tag.