BID/PROPSAL
<br />CITY OF SOUTH BNED
<br />yyi•rr�
<br />Project: Downtown South Bend to Notre Dame Trail - Notre Dame Avenue ]]
<br />Project Number: 122-040A r:
<br />For Bids Due: 3/12/2024
<br />Contractor Name: Milestone Contractors L.P.
<br />Base Bid
<br />Item
<br />No.
<br />Descripti
<br />on
<br />Quantity
<br />Unit
<br />Unit Price
<br />Total Amount
<br />1.
<br />Construction Engineering
<br />1
<br />LS
<br />$ 20,000.00
<br />$ 20,000.00
<br />2.
<br />Mobilization/Demobilization
<br />1
<br />LS
<br />$ 135,000.00
<br />$ 135,000.00
<br />3.
<br />Maintenance of Traffic
<br />1
<br />LS
<br />$ 32,000.00
<br />$ 32,000.00
<br />4.
<br />Erosion Control
<br />1
<br />LS
<br />$ 13.000.00
<br />$ 13,000.00
<br />5.
<br />Clearing Right of Way
<br />1
<br />LS
<br />$ 65.000.00
<br />$ 65,000.00
<br />6.
<br />Common Excavation
<br />4,000
<br />CYD
<br />$ 35.00
<br />$ 140.000.00
<br />7.
<br />B Borrow
<br />1,680
<br />CYD
<br />$ 65.00
<br />$ 109.200.00
<br />8.
<br />Tree, 12",Remove
<br />12
<br />EA
<br />$ 400.00
<br />$ 4,800.00
<br />9.
<br />Tree, 18",Remove
<br />7
<br />EA
<br />$ 700.00
<br />$ 4,900.00
<br />10.
<br />Tree, 30", Remove
<br />5
<br />EA
<br />$ 1,500.00
<br />$ 7,500.00
<br />11.
<br />Sign, Remove
<br />33
<br />EA
<br />$ 50.00
<br />$ 1,650.00
<br />12.
<br />Sign, Relocate
<br />18
<br />EA
<br />$ 75.00
<br />$ 1.350.00
<br />13.
<br />Light Pole, Remove
<br />15
<br />EA
<br />$ 300.00
<br />$ 4,500.00
<br />14.
<br />Pipe, Remove
<br />4,310
<br />LFT
<br />$ 18.50
<br />$ 79,735.00
<br />15.
<br />Structures, Remove
<br />33
<br />EA
<br />$ 850.00
<br />$ 28,050.00
<br />16.
<br />Fire Hydrant, Remove
<br />4
<br />EA
<br />$ 1,800.00
<br />$ 7,200.00
<br />17.
<br />Concrete Curb, Remove
<br />5,300
<br />LFT
<br />$ 8.50
<br />$ 45,050.00
<br />18.
<br />Concrete Approaches and Sidewalk, Remove
<br />2,340
<br />SYD
<br />$ 26.40
<br />$ 61.776.00
<br />19.
<br />Concrete Pavement, Remove
<br />5,310
<br />SYD
<br />$ 16.55
<br />$ 87,880.50
<br />20.
<br />Brick, Remove and Salvage
<br />4.425
<br />SYD
<br />$ 6.50
<br />$ 28,762.50
<br />21.
<br />Asphalt Milling, Variable Depth
<br />610
<br />SYD
<br />$ 10.40
<br />$ 6,344.00
<br />22.
<br />Compacted Aggregate, No. 53
<br />5.425
<br />TON
<br />$ 44.00
<br />$ 238,700.00
<br />23.
<br />HMA Surface, 9.5 mm - Type B, PG 70-28P
<br />825
<br />TON
<br />$ 112.00
<br />$ 92,400.00
<br />24.
<br />HMA Intermediate, 12.5 mm - Type B, PG-64-22
<br />1.285
<br />TON
<br />$ 96.00
<br />$ 123,360.00
<br />25.
<br />HMA Base, 25 mm - Type B, PG-64-22
<br />3,075
<br />TON
<br />$ 86.00
<br />$ 264,450.00
<br />26.
<br />Joint Adhesive, Surface Course
<br />6.260
<br />LFT
<br />$ 1.00
<br />$ 6,260.00
<br />27.
<br />Item Omitted
<br />28.
<br />PCCP, 8"
<br />965
<br />SYD
<br />$ 122.00
<br />$ 117,730.00
<br />29.
<br />Item Omitted
<br />30.
<br />PCCP, Colored, 8"
<br />190
<br />SYD
<br />$ 155.00
<br />$ 29,450.00
<br />31.
<br />PCCP for Approaches, 6"
<br />575
<br />SYD
<br />$ 119.00
<br />$ 68,425.00
<br />32.
<br />PCCP for Approaches, 8"
<br />415
<br />SYD
<br />$ 122.00
<br />$ 50,630.00
<br />33.
<br />D-1 Contraction Joint
<br />425
<br />LFT
<br />$ 17.00
<br />$ 7,225.00
<br />34.
<br />Decorative Brick Pavers
<br />140
<br />SYD
<br />$ 515.00
<br />$ 72,100.00
<br />35.
<br />Concrete Curb
<br />970
<br />LFT
<br />$ 52.50
<br />$ 50,925.00
<br />36.
<br />Concrete Curb and Gutter
<br />4.575
<br />LFT
<br />$ 29.00
<br />$ 132,675.00
<br />37.
<br />Concrete Sidewalk, 4"
<br />1,295
<br />SYD
<br />$ 78.00
<br />$ 101,010.00
<br />38.
<br />Concrete Sidewalk, 5'
<br />2,510
<br />SYD
<br />$ 60.50
<br />$ 151,855.00
<br />39.
<br />Concrete Sidewalk, Colored, 5'
<br />120
<br />SYD
<br />$ 240.00
<br />$ 28,800.00
<br />Version 09/2912021 Contractor's Bid For Public Work - 7
<br />
|