Laserfiche WebLink
BID TABULATION2024 Street and Sewer Material BidProject No: 124-004For Bids Due: March 12, 2024DIVISION A - PCC MATERIALSItem No. DescriptionQuantity Unit Unit Price Unit Price Unit Price Unit Price Unit Price Unit Price Unit Price Unit Price Unit PriceA-1 Class A Concrete2500 CY -$ -$ -$ -$ -$ -$ 164.50$ 165.00$ -$ A-2 Class A High Early800 CY -$ -$ -$ -$ -$ -$ 174.50$ 175.00$ -$ A-3 7 Bag Mix600 CY -$ -$ -$ -$ -$ -$ 186.50$ 187.00$ -$ A-4 High Early Concrete w/ Integral Color - Black650 CY -$ -$ -$ -$ -$ -$ 278.50$ 265.00$ -$ A-5 Flowable Fill, Removable350 CY -$ -$ -$ -$ -$ -$ 119.50$ 120.00$ -$ A-6 Non-Chloride Accelerator added to concrete – 0.5% 325 EA CY -$ -$ -$ -$ -$ -$ 3.75$ 3.50$ -$ A-7 Non-Chloride Accelerator added to concrete – 1% 1000 EA CY -$ -$ -$ -$ -$ -$ 7.50$ 7.00$ -$ A-8 Non-Chloride Accelerator added to concrete – 2% 2100 EA CY -$ -$ -$ -$ -$ -$ 15.00$ 14.00$ -$ DIVISION A UNIT PRICE TOTAL949.75$ 936.50$ DIVISION B - AGGREGATE MATERIALSItem No. DescriptionQuantity Unit Unit Price Unit Price Unit Price Unit Price Unit Price Unit Price Unit Price Unit Price Unit PriceB-1 No. 23 Sand5000 TON -$ -$ -$ -$ 15.50$ -$ -$ 15.00$ -$ B-2 No. 53 Gravel1000 TON -$ -$ -$ -$ -$ -$ -$ -$ -$ B-3 No. 53 Recycled Concrete7500 TON -$ -$ -$ -$ 19.00$ -$ -$ 21.05$ -$ B-4 No. 53 Slag1000 TON -$ -$ -$ -$ 20.75$ -$ -$ 22.00$ -$ B-5 Topsoil700 TON -$ -$ -$ -$ -$ -$ -$ -$ -$ B-6 No. 11 Slag Chip Stone1000 TON -$ -$ -$ -$ 23.50$ -$ -$ 26.40$ -$ DIVISION C - SEWER MATERIALS CASTINGSItem No. DescriptionQuantity Unit Unit Price Unit Price Unit Price Unit Price Unit Price Unit Price Unit Price Unit Price Unit PriceC-1 Manhole Cover and Frame: EJ 1040A, Neenah R-1642 or approved equal (Circle One) 300 EA -$ -$ 387.00$ 403.00$ -$ -$ -$ -$ -$ C-2 Catch Basin Cover & Frame: EJ 1020-M1 or Neenah R-1642 (Circle One) 300 EA -$ -$ 368.00$ 354.00$ -$ -$ -$ -$ -$ DIVISION D - SEWER MATERIALSItem No. DescriptionQuantity Unit Unit Price Unit Price Unit Price Unit Price Unit Price Unit Price Unit Price Unit Price Unit PriceD-1 MH Riser 20 3/4” D – 1”R – 7/8”L40 EA 109.00$ -$ -$ -$ -$ -$ -$ -$ -$ D-2 MH Riser 20 3/4” D – 1 1/2”R – 7/8”L40 EA 115.25$ -$ -$ -$ -$ -$ -$ -$ -$ D-3 MH Riser 20 3/4” D – 2”R – 7/8”L20 EA 121.50$ -$ -$ -$ -$ -$ -$ -$ -$ D-4 MH Riser 20 3/4” D – 2 1/2”R – 7/8”L10 EA 128.75$ -$ -$ -$ -$ -$ -$ -$ -$ D-5 MH Riser 21 3/4” D – 1”R – 1 3/8”L20 EA 154.00$ -$ -$ -$ -$ -$ -$ -$ -$ D-6 MH Riser 21 3/4” D – 1 1/2”R – 1 3/8”L30 EA 160.25$ -$ -$ -$ -$ -$ -$ -$ -$ D-7 MH Riser 21 3/4” D – 2”R – 1 3/8”L30 EA 166.50$ -$ -$ -$ -$ -$ -$ -$ -$ D-8 MH Riser 22 1/8” D – 2”R – 1 1/4”L20 EA 121.50$ -$ -$ -$ -$ -$ -$ -$ -$ D-9 MH Riser 22 1/8” D – 3”R – 1 1/4”L5 EA 139.00$ -$ -$ -$ -$ -$ -$ -$ -$ Rieth Riley Construction Co., Inc.Rieth Riley Construction Co., Inc.Rieth Riley Construction Co., Inc.Rieth Riley Construction Co., Inc.Smith Ready MixOzingaOzingaOzingaAmerican Highway ProductsBit-Mat Products of IndianaFerguson WaterworksKlink Trucking Inc.BUC Construction Supply, Inc.Klink Trucking Inc.American Highway ProductsBit-Mat Products of IndianaAmerican Highway ProductsBit-Mat Products of IndianaFerguson WaterworksKlink Trucking Inc.BUC Construction Supply, Inc.American Highway ProductsBit-Mat Products of IndianaFerguson WaterworksKlink Trucking Inc.BUC Construction Supply, Inc.Ferguson WaterworksBUC Construction Supply, Inc.K-Tech Specialty CoatingsK-Tech Specialty CoatingsK-Tech Specialty CoatingsK-Tech Specialty CoatingsSmith Ready MixSmith Ready MixSmith Ready MixOzingaPage 1 of 2