Laserfiche WebLink
ADD (iv) Contractor shall salvage roof coping cap and store in the south metal <br />building. Coping units shall be removed with care, without damage, and stacked <br />neatly for storage. <br />B. Lb. Item 2: <br />ADD (iv) Contractor shall salvage twelve (12) wooden roof beams from the <br />building, and store in the south metal building. Beams shall be removed with care, <br />without damage, and stacked neatly for storage. <br />B.l.c. Item 3: <br />REVISE (ii) Seal existing opening left in attached metal building. Concrete <br />Masonry Unit (CMU) construction shall conform to ASTM C90. Alternate <br />allowable closure method is metal roof deck spanning horizontally, with <br />appropriate permanent anchors. <br />ADD (iii) Contractor shall salvage twelve (12) wooden roof beams from the <br />building, and store in the south metal building. Beams shall be removed with care, <br />without damage, and stacked neatly for storage. <br />B.l.d. Item 4: <br />ADD (iii) Contractor shall provide a broom -swept finish within the limits noted <br />on the Exhibits. Contractor may remove foundation wall as needed to provide <br />access for machinery, but there will be no direct payment for that work. <br />Version 8/11/2020 <br />