My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Drewry’s Brewery Cleanup, Phase I Proj No. 119-031C - Dore & Assoc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Bids
>
Opening of Bids - Drewry’s Brewery Cleanup, Phase I Proj No. 119-031C - Dore & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2024 3:25:02 PM
Creation date
3/26/2024 3:23:29 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
3/26/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Scott Cianek <br />PROJECT SUPERINTENDENT <br />Scott has been a key player on the Dore team for over a decade and has been Involved in dozens of <br />large, complicated projects. Scott has risen through the ranks of our organization staring as a laborer, <br />and now takes on superintendent duties on abatement and demolition projects throughout the country. <br />Many projects have seen Scott as the project manager as he continues his professional development at <br />Dore. A trademark of Scott's projects is his organizational skills, excellent client communication and <br />project delivery within the schedule, <br />EMPLOYER SUMMARY <br />2001— present: Dore & Associates Contracting, inc., Bay City, Michigan —Superintendent and project <br />management. Responsible for large abatement and demolition projects within the United States, <br />Project safety plan implementation, field crew supervision, sub -contractor management, project <br />logistics, client meetings and documentation. Since joining Dore as a laborer in 2001, Scott has <br />successfully completed over 75 projects in over a dozen states. <br />1991— 2001: 21" Century Tool + Die, Munger, Michigan — Machine Operator, Operated machine tool <br />equipment, project layout, proto-type, project supervision, shop production, and inventory control, <br />PROJECT HIGHLIGHTS <br />Logansport State Hospital, Logansport, Indiana — Multiple buildings of 5, 3 and 2 stories was removed <br />from the center of this medical campus. In addition, a 150 FT stack from a former boiler was taken <br />down by hand due to its sensitive location, Over 200,000 SF of structures was involved in the project. <br />Contract amount; $1,650,000.00 <br />T.C. Light & Power, Traverse City, Michigan —This water front power producing facility sat near the <br />historic downtown district. Parts of the plant were disassembled and shipped to Guatamalla for re -use, <br />The remainder of the site was recycled and properly converted to public green space. Contract amount; <br />$1,100, 000.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.