My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Demo 1000 W. Sample St. (Fun FX Building) Proj No. 123-014R - Alpine Demolition
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Bids
>
Opening of Bids - Demo 1000 W. Sample St. (Fun FX Building) Proj No. 123-014R - Alpine Demolition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2024 3:17:24 PM
Creation date
3/26/2024 3:13:55 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
3/26/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
"g-ERVICES <br />CUBE/'CBE/FBE certified <br />Protection during demolition: <br />• Chain link fence to be set up around the perimeter. <br />• Signs to be posted on fence "Danger do not enter" by Alpine Demolition. <br />• Alpine Demolition will spray water on demolition debris to keep dust down. <br />• Spotters will be utilized during demolition preventing pedestrians from entering the demolition zone. <br />• Site to be left clean at end of shift with no loose debris. <br />Engineer Controls <br />o Alpine demolition will hook up to a hydrant to utilize water for dust control. <br />o Garbage trucks will cover the trailer prior to transport out of the work area to prevent spillage. <br />9. Equipment: <br />• Volvo EC480E Hi Reach Excavator w/ Hydraulic Grapple <br />• Volvo EC750E Hi Reach Excavator <br />• CAT 262 skid steer with grapple and sweeper attachment <br />10. Building Demolition <br />o After inspection and discussion, find a safe starting point on the building. Use the hydraulic grapple to grab <br />a section of the brick walls and bring it to the ground. <br />o Continue to bring the building to the ground in a manner that reduces the stored energy from existing <br />material on the ground, from being released. <br />o Load out debris in semi trailers. <br />o All debris will be sprayed with a fire hose throughout the process to reduce dust. <br />o Trucks to be loaded within work area for removal of material off site per contract specifications. <br />o Trucks will be lined with plastic and covered prior to transport offsite. <br />o Once all above ground debris has been removed offsite, use the bucket attachment to peel up the <br />concrete slab and foundations. <br />o Break concrete into manageable pieces for transport. <br />o Repeat the steps above for the transport requirements. <br />o Affected streets to be swept clean. <br />o An asbestos supervisor will be onsite throughout the demolition process. <br />The above plan may be modified and change as job conditions warrant. Please call me should there be any questions regarding <br />the above. <br />Sincerely, <br />Zach Krueger <br />Project Engineer <br />
The URL can be used to link to this page
Your browser does not support the video tag.