My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Demo 1000 W. Sample St. (Fun FX Building) Proj No. 123-014R - Alpine Demolition
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Bids
>
Opening of Bids - Demo 1000 W. Sample St. (Fun FX Building) Proj No. 123-014R - Alpine Demolition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2024 3:17:24 PM
Creation date
3/26/2024 3:13:55 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
3/26/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
® KX0CKit09WM.cem <br />A <br />IM <br />0 EMOILITIOPI SERVICES <br />Past Projects <br />DBE/WBE/FBE certified <br />Project: Mini Hall Demolition -University of Illinois 1/16/23 thru 3/31/23 <br />725 S Wright Street Champaign, IL <br />Contact: CDB Capital Development Board <br />Jacob Teegarden 217-836-3637 <br />Cost: $1,431,00.00 <br />Project Description: Illini Hall was a university building located in the center of the University of Illinois- <br />Urbana/Champaign campus. The 3 -story plus basement, wood, and masonry building built in 1907 included <br />extensive asbestos abatement prior to building demolition. Alpine prepared the surrounding site for construction <br />of the "New Illini Hall", while working on an active campus, and no disruptions to student's schedule. <br />Project: McHenry Central WWTP <br />3302 W. Waukegan Road McHenry, IL <br />Contact: City of McHenry/HR Green Sean <br />Murphy 847-878-4030 <br />Cost: $748,000.00 <br />Project Description: Demolition of WWTP, Grout line, Crush concrete, fill and restore lot <br />Project: Peoples's Gas Light Division Street 5/11/20 thru 10/16/20 <br />1110 N. Eston Avenue & 1220 W. Cortez St Chicago, IL <br />Contact: Burns & McDonnell <br />Jonathan Pawloski 630-254-3992 <br />Cost: $755,054.00 <br />Project Description: 49,000 SF, two building complete demolition. <br />Project: ORD Runway 9C-27-BP#2 7/9/18 thru 5/23/20 <br />10000 WEST OHare Road Chicago, IL <br />Contact: FH Paschen/SN Nielsen & Associates, LLC <br />Steve Devries 773-968-7631 <br />Cost: $4,608,390.00 <br />Project Description: Alpine provided demolition of eleven buildings at O'Hare Chicago International Airport to <br />make room for new runways working directly adjacent to active runways and live airplane service. Alpine <br />successfully achieved demolition of two large airline hangers adjacent to active taxiways with no interruption to <br />flight patterns. Extensive background checks were required for all employees to obtain access to this high-level <br />security of O'Hare International Airport property. <br />3515 Stem Ave. , S#. Charles, 1L 60174 > Ph: 630.761,0700 • Fx: 630.761.0777 • w•ww,knockifdown.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.