Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name: 2024 Community Crossings <br />Project Number: 124-006 <br />For Bids Due: March 26,2024,9:00 a.m., Local Time <br />Contractor Name: Rieth-Riley Construction Co., Inc. <br />2024 COMMUNITY CROSSINGS <br />DIVISION 2: WESTERN AVENUE (FROM R Al RF=PT AXIMKII 1= Tn 0 CAI t%f%kl e-rr-%�L--r% <br />ITEM <br />NO. <br />DESCRIPTION <br />QUANTITY <br />UNIT <br />UNIT PRICE <br />TOTAL <br />AMOUNT <br />HMA SurfaGe, PG70 22123 <br />$91.00 <br />$97,916.00 <br />1 <br />9.5mm, Type G <br />HMA Surface, Type B <br />4083 <br />1076 <br />TON <br />HMA !Rterrned;al.- <br />$72.75 <br />$129,495.00 <br />1. --122-, <br />2 <br />12.5mm, Type G <br />HMA Intermediate, Type B <br />4792 <br />1780 <br />TON <br />3 <br />Milling, Asphalt, 1.5 IN. <br />89 <br />SYS <br />$3.80 <br />$338.20 <br />4 <br />Milling, Asphalt, 4 IN. <br />113030 <br />SYS <br />$3.83 <br />$49,571.69 <br />12943 <br />HMA for PatGhiRg, <br />$91-00 -$26,117.00 <br />5 <br />Type GO <br />HMA for Patching, Full Depth, <br />299 <br />287 <br />TON <br />Type B <br />6 <br />Asphalt for Tack Coat <br />5 <br />TON <br />$650.00 <br />$3,250.00 <br />7 <br />Joint Adhesive, Surface <br />8555 <br />LFT <br />$0.60 <br />$5,133.00 <br />8 <br />Joint Adhesive, Intermediate <br />8555 <br />LFT <br />$0.65 <br />$5,560.75 <br />9 <br />Liquid Asphalt Sealant <br />8555 <br />LFT <br />$0.10 <br />$855.50 <br />10 <br />Compacted Aggregate, No. 53 <br />438 <br />TON <br />=$25.00 <br />=F <br />$10,875.010 <br />435 <br />11 <br />Sidewalk, Concrete <br />366 <br />SYS <br />$142.00 <br />$ <br />1,9 .01 <br />$51,972.00 <br />12 <br />Curb Ramp, Concrete <br />188 <br />SYS <br />$340.00 <br />$63,920.00 <br />13 <br />Curb, Concrete <br />643 <br />LFT <br />$67.60 <br />$43,466.80 <br />14 <br />Sheet Sign, Remove <br />1 <br />EA <br />$50.00 <br />$50.00 <br />15 <br />Sign, Sheet, 0.100 IN. Thickness <br />8 <br />SFT <br />$13.00 <br />$104.00 <br />16 <br />Line, Thermoplastic, Solid, <br />$1,809.60 <br />Yellow, 4 IN. <br />3120 <br />LFT <br />. <br />$058 <br />17 <br />Line, Thermoplastic, Broken, <br />$439.14 <br />Yellow, 4 IN. <br />563 <br />LFT <br />$0.78 <br />18 <br />Line, Thermoplastic, Solid, <br />$1,538.74 <br />L I <br />White, 4 IN. I <br />2653 <br />LFT <br />$0.58 <br />Version 09/29/2021 Special Provisions - 3 <br />