Laserfiche WebLink
<br /> Page 1 <br />Exhibit C –Compensation Packet BC-1: Basic Services (other than RPR) – Lump Sum Method of Payment <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />SUGGESTED FORMAT <br />(for use with E-500, 2008 Edition) <br /> <br />This is EXHIBIT C , consisting of 1 page, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated 3/12, 2024. <br /> <br />Payments to Engineer for Services and Reimbursable Expenses <br />COMPENSATION PACKET BC -1: Basic Services – Lump Sum <br /> <br />Article 2 of the Agreement is supplemented to include the following agreement of the parties: <br /> <br />ARTICLE 2 – OWNER’S RESPONSIBILITIES <br /> <br />C2.01 Compensation for Basic Services (other than Resident Project Representative) – Lump Sum <br />Method of Payment <br /> <br />A. Owner shall pay Engineer for Basic Services set forth in Exhibit A, except for services of <br />Engineer’s Resident Project Representative, if any, as follows: <br />1. A Lump Sum amount of $151,980 based on the following estimated distribution of <br />compensation: <br />a. Demolition Design Services $73,065 <br />b. Permitting Support $33,965 <br />c. Construction Administration $33,965 <br />d. Closeout Phase $10,985 <br />2. Engineer may alter the distribution of compensation between individual phases noted <br />herein to be consistent with services actually rendered, but shall not exceed the total Lump <br />Sum amount unless approved in writing by the Owner. <br />3. The Lump Sum includes compensation for Engineer’s services and services of Engineer’s <br />Consultants, if any. Appropriate amounts have been incorporated in the Lump Sum to <br />account for labor, overhead, profit, and Reimbursable Expenses. <br />4. The portion of the Lump Sum amount billed for Engineer’s services will be based upon <br />Engineer’s estimate of the percentage of the total services actually completed during the <br />billing period. <br />B. Period of Service: The compensation amount stipulated in Compensation Packet BC -1 is <br />conditioned on a period of service not exceeding twelve (12) months. If such period of service is <br />extended, the compensation amount for Engineer's services shall be appropriately adjusted. <br />