My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 3 - Fire Station No. 8 Replacement Proj No. 122-034 - R. Yoder Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Change Orders
>
Change Order No 3 - Fire Station No. 8 Replacement Proj No. 122-034 - R. Yoder Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2024 2:41:44 PM
Creation date
3/12/2024 2:41:41 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
3/12/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 1 of 2 <br /> <br /> <br /> <br />INTER-OFFICE MEMORANDUM <br /> <br /> DEPARTMENT OF PUBLIC WORKS <br /> DIVISION OF ENGINEERING <br />TO: Theresa Heffner, Clerk <br />Board of Public Works <br />FROM: Zach Hurst, PE, Sr. Project Engineer <br /> <br />SUBJECT: Change Order No. 3 - Project No. 122-034 <br />Fire Station #8 Replacement <br />DATE: 03/05/2024 <br /> <br />Change Order No. 3 for the subject project addresses the following items: <br /> <br />• Fire Dampers: $1,870.00 <br />o This is an omission from the Plans. Additional fire dampers are needed in the <br />electrical room. <br /> <br />• Station Signage: $6,621.00 <br />o This is an owner-initiated scope change to finalize the decorative sign at the <br />station. <br /> <br />• Porch Concrete: $5,551.00 <br />o This is an owner-initiated scope change to slightly expand the front patio area to <br />appear more inviting to the neighborhood. <br /> <br />• Mechanical Changes: $6,326.00 <br />o This is an omission from the Plans. Additional exhaust infrastructure is required <br />for the dryers. <br /> <br />• Locution Installation Labor: $26,318.00 <br />o This is an owner-initiated scope change to install the emergency alert system at <br />the station. At the time of bid, Locution had not provided the information <br />necessary for the Contractor to price out the required work. Locution is the sole- <br />source provider of this service, integrating with the County-wide emergency alert <br />dispatch system. <br /> <br />• HVAC Duct Changes: $7,093.00 <br />o This is an omission from the Plans. Ductwork was missing from plan sheets and <br />required rerouting to fit with other systems. <br /> <br />• Added Fiber Conduit: $3,542.00 <br />o Field conditions were different from the site plan, resulting in additional conduit <br />work required for hookup. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.