Laserfiche WebLink
6 <br />Z <br />BIDIPROPOSAL <br />CITY OF SOUTH BEND <br />Project Name: South Bend WWTP Degrit Building Yard Piping Replacement <br />Project Number: 123-031A <br />For Bids Due: February 27, 2024 <br />Contractor Name: HRP Construction Inc. <br />BASE BID <br />Item No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />Construction Engineering <br />1 <br />LSUM <br />33,220.00 <br />33,220.00 <br />2 <br />6" WAS and Sludge Pipe, Remove <br />500 <br />LFT <br />50.00 <br />25,000.00 <br />3 <br />8" Sludge Pipe, Remove <br />165 <br />LFT <br />60.00 <br />9,900.00 <br />4 <br />4' Wide Sidewalk, Remove <br />175 <br />LFT <br />5.00 <br />875.00 <br />5 <br />Stair Removal <br />I <br />LSUM <br />10,000.00 <br />10,000.00 <br />6 <br />Common Excavation <br />10 <br />CYS <br />100.00 <br />1,000.00 <br />7 <br />HMA Base and Surface <br />80 <br />SYS <br />200.00 <br />16,000.00 <br />8 <br />6" Ductile Iron Pipe <br />500 <br />LFT <br />166.00 <br />83,000.00 <br />9 <br />8" Ductile Iron Pipe <br />165 <br />LFT <br />260.00 <br />42,900.00 <br />10 <br />6" Ductile Iron Transition Coupling <br />6 <br />EACH <br />8,500.00 <br />51,000.00 <br />11 <br />6" Ductile Iron 11.25* Horizontal Bend <br />2 <br />EACH <br />5,500.00 <br />11,000.00 <br />12 <br />6" Ductile Iron 45* Horizontal Bend <br />4 <br />EACH <br />5,500.00 <br />22,000.00 <br />13 <br />6" Ductile Iron 90* Horizontal Bend <br />3 <br />EACH <br />5,500.00 <br />16,500.00 <br />14 <br />8" Ductile Iron Transition Coupling <br />2 <br />EACH <br />9,000.00 <br />18,000.00 <br />15 <br />8" Ductile Iron 45* Horizontal Bend <br />2 <br />EACH <br />6,000.00 <br />12,000.00 <br />16 <br />8" Ductile Iron 90* Horizontal Bend <br />1 <br />EACH <br />6,000.00 <br />6,000.00 <br />17 <br />5'Wide Sidewalk, Concrete, 4 IN <br />175 <br />LFT <br />52.00 <br />9,100.00 <br />18 <br />6' Wide Curb, Remove <br />65 <br />LFT <br />25.00 <br />1,625.00 <br />19 <br />6" Wide Curb <br />12 <br />LFT <br />165.00 <br />1,980.00 <br />20 <br />Concrete, Remove <br />25 <br />CU FT <br />50.00 <br />1,250.00 <br />21 <br />Concrete <br />165 <br />CU FT <br />30.00 <br />4,950.00 <br />22 <br />Stair Replacement <br />I <br />LSUM <br />35,000.00 <br />35,000.00 <br />23 <br />Handrail <br />I <br />LSUM <br />15,000.00 <br />15,000.00 <br />24 <br />Concrete Equipment Pad <br />1 <br />LSUM <br />15,000.00 <br />15,000.00 <br />25 <br />Mulched Seeding and Sodding <br />80 <br />SYS <br />25.00 <br />2,000.00 <br />26 <br />Filter Sock <br />35 <br />LFT <br />20.00 <br />700.00 <br />[27 <br />HVAC Re -Installation <br />1- <br />LSUM <br />34,000.00 <br />34,000.00 <br />BASE BID TOTAL 479,000.00 <br />Bidder (Firm): HRP Construction Inc. <br />Address: 5777 Cleveland Road, P.O. Box 266, South Bend, IN 46624-0266 <br />Version 07/1912023 Contractor's Bid for Public Works - 7 <br />