My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Downtown SB to ND Trail - Notre Dame Ave. Proj No. 122-040A - HRP Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Bids
>
Opening of Bids - Downtown SB to ND Trail - Notre Dame Ave. Proj No. 122-040A - HRP Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 1:14:36 PM
Creation date
3/12/2024 2:29:28 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
3/12/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Exported: 3/11/2024 9:03:35 AM <br />Subject: Request for Quote from HRP Construction Inc. for Downtown South Bend to Notre Dame Trail - Notre Dam <br />Message: <br />HRP <br />Cow:rauerwui <br />DATE: March 11, 2024 <br />REQUEST FOR QUOTE <br />PROJECT NAME: Downtown South Bend to Notre Dame Trail <br />- Notre Dame Avenue <br />Good Morning, <br />HRP plans to bid on the South Bend Notre Dame Ave Reconstruction Project. The work consists of approx 2600 LFT of Storm pipe, 2900 LFT of water <br />main, 1700 LFT of CIPP Linning, and complete road reconstruction on Notre Dame Ave from South Bend Ave to Angela Blvd. The road improvements <br />include brick pavers, benches, trash cans, bike racks, all new street lighting, all new sidewalks, colored sidewalks, curbs, and asphalt. <br />TO: Joe's Plumbing FROM: Joseph Jonas <br />Joseph P Lumber joej@hrpconstruction.com <br />demo@email.com 574-271-7800 <br />PROJECT NAME: Downtown South Bend to Notre Dame Trail - Notre Dame Avenue <br />PROJECT/LOCATION: 1038 N Notre Dame Ave <br />South Bend, IN 46617 <br />PROJECT DESCRIPTION: <br />Storm, Water, CIPP Lining, and Road Reconstruction of Notre Dame Ave. From Angela to South Bend Ave Project is expected to start in <br />May and be completed September 4 this year. <br />To access plans and specs, CL Q.KJ FUR,E <br />-or- <br />go to www.hroplanroom.com and enter Access Key: DEMOKEY123 <br />Submit Quotes by 03/1112024 via email joej@hrpconstruction.com. <br />Equal Opportunity Employer <br />Shipping: 5777 Cleveland Road South Bend, IN 46628-9418 Phone 574-271-7800 <br />i <br />Mailing: P.O. Box 266 South Bendy IN 46624-0266 FAX 574-271-0524 <br />Note: This message was sent from an Automated Project Messaging System. If you do not wish to recal- these smalls, please contact the Sender or Astt httos:/Avww.hmolanroom.com/ootout to remove <br />yourself from our system. <br />
The URL can be used to link to this page
Your browser does not support the video tag.