BID/PROPOSAL
<br />CITY OF SOUTH BEND
<br />Project Name: Downtown South Bend to Notre Dame Trail - Notre Dame Avenue
<br />Project Number: 122-040A
<br />For Bids Due:
<br />T11
<br />March 12, 2024
<br />Contractor Name: HRP Construction Inc
<br />Base Bid
<br />Item
<br />No.
<br />Description
<br />Quantity
<br />Unit
<br />Unit Price
<br />Total Amount
<br />1.
<br />Construction Engineering
<br />1
<br />LS
<br />$ 168,000,00
<br />$ 168,000.00
<br />2.
<br />Mobilization/Demobilization
<br />1
<br />LS
<br />$ 665,000.00
<br />$ 665,000.00
<br />3.
<br />Maintenance of Traffic
<br />1
<br />LS
<br />$ 205,000.00
<br />$ 205,000.00
<br />4.
<br />Erosion Control
<br />1
<br />LS
<br />$ 63,661.95
<br />$ 63,661.95
<br />5.
<br />Clearing Right of Way
<br />1
<br />LS
<br />$ 375,000.00
<br />$ 375,000.00
<br />6.
<br />Common Excavation
<br />4,000
<br />CYD
<br />$ 65.00
<br />$ 260,000.00
<br />7.
<br />B Borrow
<br />1,680
<br />CYD
<br />$ 10.00
<br />$ 16,800.00
<br />8.
<br />Tree, 12",Remove
<br />12
<br />EA
<br />$ 400.00
<br />$ 4,800.00
<br />9.
<br />Tree, 18",Remove
<br />7
<br />EA
<br />$ 700.00
<br />$ 4,900.00
<br />10.
<br />Tree, 30", Remove
<br />5
<br />EA
<br />$ 1,500-00
<br />$ 7,500.00
<br />11.
<br />Sign, Remove
<br />33
<br />EA
<br />$ 200.00
<br />$ 6,600.00
<br />12.
<br />Sign, Relocate
<br />18
<br />EA
<br />$ 400,00
<br />$ 7,200.00
<br />13.
<br />Light Pole, Remove
<br />15
<br />EA
<br />$ 1,000.00
<br />$ 15,000.06
<br />14.
<br />Pipe, Remove
<br />4,310
<br />LFT
<br />$ 14,00
<br />$ 60,340.00
<br />15.
<br />Structures, Remove
<br />33
<br />EA
<br />$ 650.00
<br />$ 21,450.00
<br />16.
<br />Fire Hydrant, Remove
<br />4
<br />EA
<br />$ 1,250.00
<br />$ 5,000.00
<br />17.
<br />Concrete Curb, Remove
<br />5,300
<br />LFT
<br />7.50
<br />$ 39,750.00
<br />18.
<br />Concrete Approaches and Sidewalk, Remove
<br />2,340
<br />SYD
<br />8.50
<br />$ 19,890.00
<br />19.
<br />Concrete Pavement, Remove
<br />5,310
<br />SYD
<br />$ 11.00
<br />$ 58,410,06
<br />20.
<br />Brick, Remove and Salvage
<br />4,425
<br />SYD
<br />$ 3.00
<br />$ 13,275.00
<br />21.
<br />Asphalt Milling, Variable Depth
<br />610
<br />SYD
<br />$ 27.36
<br />$ 116,689M
<br />22.
<br />Compacted Aggregate, No. 53
<br />5,425
<br />TON
<br />$ 65.00
<br />$ 352,625.00
<br />23.
<br />HMA Surface, 9.5 mm - Type B, PG 70-28P
<br />825
<br />TON
<br />$ 12024
<br />$ 99,198.00
<br />24.
<br />HMA Intermediate, 12.5 mm - Type B, PG 64-22
<br />1,285
<br />TON
<br />$ 88.07
<br />$ 113,159.95
<br />25.
<br />HMA Base, 25 mm -Type B, PG 64-22
<br />3,075
<br />TON
<br />$ 78.01
<br />$ 239,88015
<br />26.
<br />Joint Adhesive, Surface Course
<br />6,260
<br />LFT
<br />5 0.70
<br />$ 4,382.00
<br />27.
<br />Item Omitted
<br />$ -
<br />28.
<br />PCCP, 8"
<br />965
<br />SYD
<br />$ 108.45
<br />$ 104,654.25
<br />29.
<br />Item Omitted
<br />$ -
<br />30.
<br />PCCP, Colored, 8"
<br />190
<br />SYD
<br />$ 133,70
<br />$ 25,403.00
<br />31.
<br />PCCP for Approaches, 6"
<br />575
<br />SYD
<br />$ 70.00
<br />$ 40,250.00
<br />32.
<br />PCCP for Approaches, 8"
<br />415
<br />SYD
<br />$ 87.66
<br />$ 36,378.90
<br />33.
<br />D-1 Contraction Joint
<br />425
<br />LFT
<br />$ 21.95
<br />$ 9,328.75
<br />34.
<br />Decorative Brick Pavers
<br />140
<br />SYD
<br />$ 376,50
<br />$ 52,710.00
<br />35.
<br />Concrete Curb
<br />970
<br />LFT
<br />$ 35.96
<br />$ 34,881.20
<br />36.
<br />Concrete Curb and Gutter
<br />4,575
<br />LFT
<br />$ 23.53
<br />$ 107,649.75
<br />37.
<br />Concrete Sidewalk, 4"
<br />1,295
<br />SYD
<br />$ 71.36
<br />$ 92,411.20
<br />38.
<br />Concrete Sidewalk, 5"
<br />2,510
<br />SYD
<br />$ 69-14
<br />$ 173,541.40
<br />39.
<br />Concrete Sidewalk, Colored, 5"
<br />120
<br />SYD
<br />$ 152.01
<br />1 $ 18,241.201
<br />Version 09/29/2021 Contractor's Bid for Public Works - 7
<br />
|