My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 1 to OEA - Byer's Softball Proj No. 123-072 – DLZ Indiana, LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No 1 to OEA - Byer's Softball Proj No. 123-072 – DLZ Indiana, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2024 1:33:59 PM
Creation date
2/27/2024 1:33:49 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
2/27/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 8 (Exhibit K – (Amendment to Owner-Engineer Agreement) – Attachment 1) d. Other portions of the Agreement (including previous amendments, if any) are modified as follows: Revise Article 2, C2.01, A, 1. As follows: 1. Unless otherwise noted, the Owner shall pay the Engineer on a Lump Sum basis, an amount of $353,850.00 based on the following estimated distribution of compensation: Item Description Amount Type A1.01 Project Management $17,800.00 Lump Sum A1.02 Site Assessment $10,500.00 Lump Sum A1.03 Conceptual Planning $42,300.00 Lump Sum A1.04 Opinion of Probable Cost $8,900.00 Lump Sum A1.06 Topographic and Boundary Survey $47,100.00 Lump Sum A1.07 Subsurface Utility Locates $20,000.00 Allowance A1.08 Geotechnical Engineering Exploration $9,500.00 Lump Sum A1.09 60% Design Phase $91,300.00 Lump Sum A1.10 90% Design Phase $75,700.00 Lump Sum A1.11 Final Design Phase $18,700.00 Lump Sum A1.12 Permitting $12,050.00 Lump Sum Total, Not To Exceed $353,850.00 Revise Appendix 1 to Exhibit C in its entirety as follows: Standard Hourly Rates Schedule A. Standard Hourly Rates: 1. Standard Hourly Rates are set forth in this Appendix 1 to this Exhibit C and include salaries and wages paid to personnel in each billing class plus the cost of customary and statutory benefits, general and administrative overhead, non-project operating costs, and operating margin or profit. 2. The Standard Hourly Rates apply only as specified in Article 2, C2.01.
The URL can be used to link to this page
Your browser does not support the video tag.