My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 2 - Fire Station No. 8 Replacement Proj No. 122-034 - R Yoder Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Change Orders
>
Change Order No 2 - Fire Station No. 8 Replacement Proj No. 122-034 - R Yoder Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2024 1:27:24 PM
Creation date
2/27/2024 1:27:21 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
2/27/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 1 of 1 <br /> <br /> <br /> <br />INTER-OFFICE MEMORANDUM <br /> <br /> DEPARTMENT OF PUBLIC WORKS <br /> DIVISION OF ENGINEERING <br />TO: Theresa Heffner, Clerk <br />Board of Public Works <br />FROM: Zach Hurst, PE, Sr. Project Engineer <br /> <br />SUBJECT: Change Order No. 2 - Project No. 122-034 <br />Fire Station #8 Replacement <br />DATE: 02/16/2024 <br /> <br />Change Order No. 2 for the subject project adds the following scope items to the contract: <br /> <br />• Third Party Testing: $11,573.00 <br />o This is an omission from the Specifications. This covers necessary soil and <br />concrete testing. <br />• Garden Shed Power: $2,260.00 <br />o This is an owner-initiated scope change to provide power to the landscaping <br />shed. <br />• Flooring Changes: $1,179.00 <br />o This is an error in the plans, requiring a change in flooring type to provide more <br />traction. <br />• Apparatus Bay Sub Siding: $3,621.00 <br />o This is an owner-initiated scope change to modify the detail where the subsiding <br />in the apparatus bay meets the foundation concrete. <br />• Four-Fold Doors: $83,200.00 <br />o This is an owner-initiated scope change to modify the exit doors for the <br />apparatus bay. Four-fold doors open faster than overhead doors. <br /> <br />• TOTAL: $101,833.00 <br /> <br />This change order does not affect the existing contract completion date of September 19, 2024. <br /> <br />Funding for this change order is available through the Fire Department’s capital fund. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.