Laserfiche WebLink
2/21/24, 8:46 AM Projectmates Contract <br />file:///C:/Users/epaul/AppData/Local/Microsoft/Windows/INetCache/Content.Outlook/BUMOPNZ8/CO%232 breakdown.html 3/4 <br />Item <br /># <br />Budget/ <br />FundCode <br />WBS/ <br />Section Description Quantity UoM Unit <br />Price <br />Total <br />Amount <br />008 99 CO#2 Add #53 crushed concrete 42.55 TON 81.00 3,446.55 <br />009 99 CO#2 Added #53's and LF Curb (Average)2.00 EA 1,700.00 3,400.00 <br />Total 65,651.55 <br />3-A <br />006 34 Restriping Chevron Set 0.00 Each 1,000.00 0.00 <br />007 34 High Contrast Advanced Warning Striping -1.00 Each 400.00 -400.00 <br />Total -400.00 <br />4 <br />001 34 Concrete Speed Hump 1.00 Each 17,105.00 17,105.00 <br />002 34 Installation Rubber Speed Table 0.00 Each 5,555.00 0.00 <br />003 34 Installation Roadway Signs 2.00 Each 245.00 490.00 <br />004 34 High Contrast Chevron Pavement Marking <br />Set 2.00 Each 1,000.00 2,000.00 <br />005 34 High Contrast Advanced Warning Striping -34.00 Each 400.00 -13,600.00 <br />006 99 CO#2 Add Thermo Advance Warning <br />Striping 58.00 EA 825.00 47,850.00 <br />007 99 CO#2 Add Curb 88.00 LF 65.00 5,720.00 <br />008 99 CO#2 Add #53 crushed concrete 53.00 TON 81.00 4,293.00 <br />009 99 CO#2 Added #53's and LF Curb (Average)0.00 EA 1,700.00 0.00 <br />Total 63,858.00 <br />4-A <br />006 34 Restriping Chevron Set 0.00 Each 1,000.00 0.00 <br />007 34 High Contrast Advanced Warning Striping -22.00 Each 400.00 -8,800.00 <br />Total -8,800.00 <br />5 <br />001 34 Concrete Speed Hump 1.00 Each 16,585.00 16,585.00 <br />002 34 Installation Rubber Speed Table -2.00 Each 5,535.00 -11,070.00 <br />003 34 Installation Roadway Signs -2.00 Each 245.00 -490.00 <br />004 34 High Contrast Chevron Pavement Marking <br />Set 2.00 Each 1,000.00 2,000.00 <br />005 34 High Contrast Advanced Warning Striping -24.00 Each 400.00 -9,600.00 <br />006 99 CO#2 Add Thermo Advance Warning <br />Striping 22.00 EA 825.00 18,150.00 <br />007 99 CO#2 Add Curb 132.00 LF 65.00 8,580.00 <br />008 99 CO#2 Add #53 crushed concrete 158.48 TON 81.00 12,836.88 <br />009 99 CO#2 Added #53's and LF Curb (Average)1.00 EA 1,700.00 1,700.00 <br />Total 38,691.88 <br />5-A <br />006 34 High Contrast Advanced Warning Striping 0.00 Each 400.00 0.00 <br />Total 0.00 <br />6