Laserfiche WebLink
24. <br />Set up for borings and machine soundings <br />a. Borings and machine soundings less than 20 ft deep <br />23 each <br />$74.00 <br />$1,702.00 <br />b. Rock core borings <br />each <br />$126.00 <br />25. <br />Additional 2-in. split spoon sampling <br />16 each <br />$22.00 <br />$352.00 <br />26. <br />3-in. split spoon samples <br />each <br />$24.00 <br />27. <br />3-in. Shelby tube samples <br />5 each <br />$66.00 <br />$330.00 <br />28. <br />Bag Samples <br />a. 25-lb sample <br />2 each <br />$54.00 <br />$108.00 <br />b. 5-lb sample <br />4 each <br />$35.00 <br />$140.00 <br />29. <br />Field vane shear test <br />a. Standard <br />each <br />$121.00 <br />b. Nighttime <br />each <br />$143.00 <br />30. <br />4 1/2-in. cased hole <br />ft <br />$13.25 <br />31. <br />Installation of geotechnical instruments <br />a. Inclinometer casing installation <br />i. Standard <br />ft <br />$16.00 <br />ii. Nighttime <br />ft <br />$19.00 <br />b. Piezometer installation up to 25 ft below surface <br />each <br />$284.00 <br />c. Piezometer installation deeper than 25 ft below surface <br />each <br />$315.00 <br />d. Metal protective outer cover for inclinometer and piezometer <br />each <br />$132.00 <br />casings <br />32. <br />Railroad expenses <br />Actual Cost <br />33. <br />Twenty-four hour water levels <br />a. Field measurements per borehole <br />i. Standard <br />3 each <br />$40.00 <br />$120.00 <br />ii. Nighttime <br />each <br />$48.00 <br />b. PVC slotted pipe <br />50 ft <br />$6.50 <br />$325.00 <br />34. <br />Borehole backfilling <br />a.0to15ft <br />i. SPT <br />a. Standard <br />20 each <br />$150.00 <br />$3,000.00 <br />b. Nighttime <br />each <br />$175.00 <br />ii. CPT <br />a. Standard <br />each <br />$49.00 <br />b. Nighttime <br />each <br />$57.00 <br />b. More than 15 ft <br />i. SPT <br />a. Standard <br />60 ft <br />$7.00 <br />$420.00 <br />b. Nighttime <br />ft <br />$8.25 <br />ii. CPT <br />a. Standard <br />ft <br />$2.00 <br />b. Nighttime <br />ft <br />$2.40 <br />c. Pavement restoration <br />i. Standard <br />18 each <br />$65.00 <br />$1,170.00 <br />ii. Nighttime <br />each <br />$75.00 <br />35. <br />Equipment rental <br />Actual Cost <br />36. <br />Traffic control <br />a. Flag crew <br />day <br />$800.00 <br />b. Equipment rental and professional traffic services <br />Actual Cost <br />$10,000.00 <br />c. Flag crew with equipment <br />day <br />$950.00 <br />37. <br />Centerline surveying <br />Actual Cost <br />38. <br />Percolation Test <br />a. Granular Soils (A-1, A-2, A-3) <br />each <br />$2,000.00 <br />b. Cohesive Soils (A-4, A-5, A-6, A-7) <br />each <br />$3,000.00 <br />Subtotal (Geotechnical Field) <br />$23,593.00 <br />