My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Planning Market District Improvements Proj No. 123-053 – American Structurepoint, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Planning Market District Improvements Proj No. 123-053 – American Structurepoint, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2025 4:11:19 PM
Creation date
2/13/2024 3:39:19 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
2/13/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2. Boring/coring plan depicting the site characteristics as well as the boring and <br />pavement core locations. <br />3. Descriptions of field exploration and laboratory testing programs. <br />4. Boring logs and laboratory test results, including groundwater observations <br />made during drilling operations. <br />5. Summary of the retained pavement cores, including pavement core data <br />sheets with photographs. <br />6. Estimated soil conditions and characteristics of the soil encountered in the <br />borings and expected at the various locations. <br />7. A description of the soils expected to be encountered (as encountered in the <br />borings) during excavation and at the pipe invert elevation for proposed storm <br />sewers. <br />8. Any potential problematic soil conditions that might be troublesome during <br />construction. <br />Further, this proposal considers that soil profile sheets will not be required for the project. <br />COST ESTIMATE AND TIME SCHEDULE <br />The estimated cost of performing the geotechnical services for the subject project, as <br />presented in the Scope of Services, is as follows and is outlined in the attached fee <br />schedule. <br />Geotechnical Field and Laboratory (Unit Rate)............................................................ $33,133.50 <br />Geotechnical Enaineerina and Coordination (Lump Sum) ......................................... $10.928.50 <br />Total Geotechnical Services.......................................................................................... $44,062.00 <br />The fieldwork for the geotechnical investigation is expected to take approximately five (5) <br />working days to complete. Following Authorization to Proceed, drilling would commence <br />within four to five to six (5-6) weeks of receiving the necessary road occupancy permits. A <br />geotechnical data report would be submitted within four to five (4 to 5) f fieldwork <br />completion <br />American Structurepoint, Inc. Resource International, Inc. <br />South Bend Market District Improvements Engineering ConsultantsU <br />City of South Bend, Indiana 5 Rii Proposal No. 23-1086 11/07/2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.