Laserfiche WebLink
Compensation for Basic Services not including Resident Project Representative) (as described in Exhibit A, Part I) <br />2 <br />Decision Question: Which method of compensation is to be used? <br />Percentage of <br />Direct Labor <br />Direct Labor <br />Lump <br />Standard Hourly <br />Construction <br />Costs Times a <br />Costs Plus <br />Salary Costs <br />Sum <br />Rates <br />Costs <br />Factor <br />Overhead Plus a <br />Times a Factor <br />Fixed Fee <br />Use This Base <br />packet <br />Compensation <br />BC-1 <br />Packet BC-2 <br />Packet BC-3 <br />Packet BC-4 <br />Packet BC-5 <br />Packet BC-6 <br />Packet <br />Include This <br />N/A <br />Appendices 1 and 2 <br />N/A <br />Appendix 1 <br />Appendix 1 <br />Appendix 1 <br />Appendix <br />Compensation for Resident Project Representative (as described in Exhibit A, Paragraph A1.05.A.2, and in Exhibit D) <br />Decision Question: Which method of compensation is to be used? <br />Standard Hourly <br />Percentage ofDirect <br />Labor Costs <br />Salary Costs Times a <br />Lump Sum <br />Rates <br />Construction <br />Times a Factor <br />Factor <br />Costs <br />Use This RPR <br />Compensation <br />Packet RPR-1 <br />Packet RPR-2 <br />Packet RPR-3 <br />Packet RPR-4 <br />Packet RPR-5 <br />Packet <br />Include This <br />N/A <br />Appendices 1 <br />N/A <br />Appendix 1 <br />Appendix 1 <br />Appendix <br />and 2 <br />Page 1 <br />(Exhibit C — Compensation Decision Guide) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />