My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Demolition of SB Med. Foundation Project No. 123-076 – American Structurepoint, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Demolition of SB Med. Foundation Project No. 123-076 – American Structurepoint, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2024 3:39:19 PM
Creation date
2/13/2024 3:39:00 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
2/13/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mr. Zach Hurst <br />January 15, 2024, revised January 31, 2024 <br />Page 3 <br />2023.03157 <br />the report. It should also be noted that all non‐friable materials, except for floor tiles and <br />mastics on concrete, will be documented, quantified, and assumed as asbestos‐containing <br />materials. During demolition activities, these materials can remain in place and be disposed of <br />as general construction waste at a construction and demolition (C&D) landfill. <br />e. A final letter report will be prepared upon completion of the asbestos inspection and receipt of <br />all sampling results. The report will include a summary of the asbestos sampling results and a <br />description of the assessment activities. Any areas that were not accessible or any unforeseen <br />obstacles encountered during the inspection will be noted. <br />3. Building Demolition Request for Proposal (RFP) <br />a. Schedule and scope to be determined after site visits and survey(s). <br />4. New Parking Lot Request for Proposal (RFP to replace demolished building and portion of site). <br />a. Schedule and scope to be determined after award of Building Demolition. <br />5. Civil/Site Design Services <br />a. Private Utility Locates <br />i. American Structurepoint will partner with a subconsultant to horizontally designate <br />existing utilities consisting of gas, water, electric, communication, fiber optic, cable <br />television, force main, and lighting within the project area. <br />ii. The Subconsultant will utilize surface geophysical methods to interpret the presence of <br />subsurface utilities and use electromagnetic equipment to detect and designate the <br />selected subsurface utilities. Using this technical, paint markings and/or flags will be <br />placed to show approximate horizontal position of the desired utilities. <br /> <br />b. Topographic Survey <br />i. Pre‐Demo Topographic Survey (±3.2 acres) <br /> <br /> <br /> <br />ii. Post‐Topographic Survey (±1.0 acres) <br /> <br />DocuSign Envelope ID: 8E7BADB5-C527-4326-B36C-C459763FF219
The URL can be used to link to this page
Your browser does not support the video tag.