My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Demolition of SB Med. Foundation Project No. 123-076 – American Structurepoint, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Demolition of SB Med. Foundation Project No. 123-076 – American Structurepoint, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2024 3:39:19 PM
Creation date
2/13/2024 3:39:00 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
2/13/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />2023.03157 <br />January 15, 2024, revised January 31, 2024 <br />Mr. Zach Hurst, P.E. <br />Senior Project Engineer <br />City of South Bend, Indiana <br />zhurst@southbendin.gov <br /> <br />Re: South Bend Medical Foundation (SBMF) building demolition package and site preparation for a <br />new parking lot – Phase I of up to four (4) phases within Beacon Design District <br />530 N. Lafayette Boulevard, South Bend, Indiana 46601 <br /> Proposal No.: 2023.03157 <br />Dear Zach, <br />Thank you for contacting American Structurepoint, Inc., for your upcoming project. We look forward to <br />continuing our relationship and have prepared a thorough and comprehensive proposal for this project. <br />We appreciate your confidence and trust in our abilities and thank you for affording us the opportunity <br />to submit the following proposal. <br />PROJECT SCOPE <br />We will provide architectural and engineering design services to prepare a building demolition request <br />for proposal for the South Bend Medical Foundation (SBMF) building that is currently owned by Beacon <br />Health System. The building is currently closed but will require a Phase II Environmental Site Assessment <br />(ESA) to be performed to aid in identifying any remediation or abatement that would be necessary prior <br />to any building demolition to be completed. We will perform an initial site visit to walk the facility with <br />the owner (Beacon Health) as well as the city to set level of expectation for any architectural artifacts, <br />furniture or equipment that would be salvaged/removed prior to demolition. <br />This proposal and the attached scope of professional services includes cost estimating services as well as <br />Civil Engineering to prepare the site for a new parking lot (separate package for bidding purposes). It is <br />our understanding this project will be phased out, so our first phase is to evaluate the existing building <br />for what can be salvaged and/or would need to be addressed prior to demolition of the structure <br />completely. <br />SITE <br />The project is located at 530 N. Lafayette Boulevard and runs the length of W. Navarre Street to N. Main <br />Street to the east. There are two vehicular access points off N. Lafayette Boulevard along with smaller <br />access points off N. Main Street. There is an alley running south between the parcels to the south that <br />are not part of this demolition or new parking lot development (perimeter fence boundary to be <br />established). <br />DocuSign Envelope ID: 8E7BADB5-C527-4326-B36C-C459763FF219
The URL can be used to link to this page
Your browser does not support the video tag.