Laserfiche WebLink
<br /> <br />Page 2 <br />(Exhibit A – Engineer’s Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />6. Revise the 50% Preliminary Roadway Design Plans with supporting documents and any <br />other deliverables in response to Owner’s comments, as appropriate, and furnish to Owner <br /> 2 copies of the revised Preliminary Design Phase documents, revised opinion of <br />probable Construction Cost, and any other deliverables within 14 calendar days after <br />receipt of Owner’s comments. <br />B. After acceptance by Owner of the 50% Preliminary Roadway Design Plans, Engineer Shall: <br />1. Provide technical criteria, written descriptions, and design data for Owner’s use in filing <br />applications for permits from or approvals of governmental authorities having jurisdiction <br />to review or approve the final design of the Project; assist Owner in consultations with such <br />authorities; and revise the Drawings and Specifications in response to directives from such <br />authorities. <br />2. Advise Owner of any adjustments to the opinion of probable Construction After acceptance <br />by Owner of the 50% Preliminary Roadway Design Plans with supporting documents, <br />revised opinion of probable Construction Cost as determined in the Preliminary Design <br />Phase, and any other deliverables subject to any Owner-directed modifications or changes <br />in the scope, extent, character, or design requirements of or for the Project, and upon <br />written authorization from Owner, Engineer shall: <br />a. Prepare final Drawings and Specifications indicating the scope, extent, and character of <br />the Work to be performed and furnished by Contractor. <br />b. Cost known to Engineer. <br />c. Perform or provide the following additional Final Roadway Design Plans which shall <br />include the following tasks and/or deliverables: <br />1) Prepare and furnish bidding documents for review by Owner, its legal counsel, and <br />other advisors, and assist Owner in the preparation of other related documents. <br />Within 14 days of receipt, Owner shall submit to Engineer any comments and, <br />subject to the provisions of Paragraph 6.01.G, instructions for revisions. <br /> <br />2) Revise the bidding documents in accordance with comments and instructions from <br />the Owner, as appropriate, and submit 2 final copies of the bidding documents, <br />a revised opinion of probable Construction Cost, and any other deliverables to <br />Owner within 7 calendar days after receipt of Owner’s comments and <br />instructions. <br /> <br />C. Engineer’s services under the Roadway Design Phase will be considered complete on the date <br />when the submittals required by Paragraph A1.01.B have been delivered to Owner. <br />A1.02 Bidding or Negotiating Phase <br />A. After acceptance by Owner of the bidding documents and the most recent opinion of probable <br />Construction Cost as determined in the Final Design Phase, and upon written authorization by <br />Owner to proceed, Engineer shall: