Laserfiche WebLink
<br /> <br />Page 1 <br />(Exhibit A – Engineer’s Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />This is EXHIBIT A, consisting of pages, referred to <br />in and part of the Agreement between Owner and <br />Engineer for Professional Services dated , . <br />Engineer’s Services <br /> <br />Article 1 of the Agreement is supplemented to include the following agreement of the parties. <br /> <br />Engineer shall provide Basic and Additional Services as set forth below. <br /> <br />PART 1 – BASIC SERVICES <br />A1.01 Roadway Design Phase <br />A. Engineer Shall: <br />1. No topographic survey tasks shall be performed for this project and Roadway Design Plans <br />shall be generated utilizing the most current aerial imagery available to date. <br />2. Prepare or perform the following 50% Preliminary Roadway Design Plans which shall <br />include the following tasks and/or deliverables: <br />a. Title Sheet <br />b. Index Sheet <br />c. Typical Cross Sections <br />d. Maintenance of Traffic Schemes <br />e. Plans Sheets <br />f. Traffic Signal & Pedestrian Push Button Detail Sheets <br />g. Intersection and Curb Ramp Detail Sheets <br />h. Pavement Markings Sheets <br />i. Pavement Quantities & Approaches Table <br />j. Miscellaneous Construction Detail Sheets <br />3. Advise Owner if additional reports, data, information, or services of the types described in <br />Exhibit B are necessary and assist Owner in obtaining such reports, data, information, or <br />services. <br />4. Based on the information contained in the 50% Preliminary Roadway Design Plans with <br />supporting documents, prepare a revised opinion of probable Construction Cost, and assist <br />Owner in collating the various cost categories which comprise Total Project Costs. <br />5. Furnish 2 review copies of the 50% Preliminary Roadway Design Plans with <br />supporting documents and any other deliverables to Owner within 30 calendar days of <br />authorization to proceed with this phase and review them with Owner. Within 14 <br />calendar days of receipt, Owner shall submit to Engineer any comments regarding the <br />Preliminary Design Phase documents and any other deliverables. <br />