My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LPA Contract - SRTS Our Lady of Hungary Proj No. 122-007 – United Consulting
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Agreements/Contracts/Proposals/Addenda
>
LPA Contract - SRTS Our Lady of Hungary Proj No. 122-007 – United Consulting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2024 3:38:42 PM
Creation date
2/13/2024 3:38:27 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
2/13/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Version 6-8-2017 <br />21 <br />APPENDIX "C" <br />SCHEDULE: <br />No work under this Contract shall be performed by the CONSULTANT until the CONSULTANT <br />receives a written notice to proceed from the LPA. <br />All work by the CONSULTANT under this Contract shall be completed and delivered to the LPA for <br />review and approval within the approximate time periods shown in the following submission schedule: <br />The CONSULTANT will be prepared to begin the work under this Agreement within five (5) days after a letter of <br />notification to proceed is received from the Local Public Agency. The CONSULTANT shall complete and deliver <br />the final construction record and final estimate to the LaPorte District Office of INDOT within forty-five (45) <br />calendar days after the contractor’s last day of work or receipt of all necessary paperwork from the Contractor, <br />whichever is later. <br />The Inspection budget was based on the following project schedule: <br />INDOT Contract Letting Date: March 13, 2024 <br />Start of construction on or after May 12, 2024 <br />Shutdown: N/A <br />Anticipated completion date of July 28, 2024 <br />Contract completion date of October 31, 2024 <br />Should these schedule dates be reduced or increased or additional man-hours be required, the contract shall be <br />modified accordingly. <br />The CONUSLTANT will be prepared to begin the work under this agreement within five (5) days <br />after letter of notification to proceed is received from the LPA. The CONSULTANT shall conform to <br />the below listed items: <br />1)Pre-construction minutes written and distributed for concurrence, five (5) days after <br />the pre-construction meeting is held. <br />2)Amended Final Construction Record as necessary to meet requirements of the Tree <br />Plantings and Notice of Termination to District Construction Director within ten (10) <br />days of Planting acceptance or Notice of Termination filing.