My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1 - Century Center Water Softener Proj No. 123-041 - D.A. Dodd, LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Change Orders
>
Change Order No 1 - Century Center Water Softener Proj No. 123-041 - D.A. Dodd, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2024 3:10:44 PM
Creation date
2/13/2024 3:10:41 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
2/13/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Quote Number:Quote By:Garrett McBride <br />Quote Date:Contact Email:garrettmcbride@dadodd.com <br />Customer Name: Customer Site Address: <br />Customer Contact: <br />Customer Contact PH: <br />Customer E-mail: <br />Job Description: <br />Replace existing ejector pump control panel and float system with new Liberty AE34 Series panel <br />and 3 floats. Turn off power supply to exisiting panel. Install temporary disconnect and on/off <br />switch for intermittent use of pumps. Demo existing control panel and floats. Install new <br />control panel and floats. Disconnect temporary power supply and connect pumps to new <br />control panel. Check new control panel and pump operation. <br />Special Exceptions/Lead Times: <br />If quote is acceptable please sign and return to garrettmcbride@dadodd.com or fax to 574-968-0590. <br />Signature of Acceptance: Date of Acceptance: <br />Accepted By: Customer PO#: <br />Terms: Net thirty (30) days from invoice completion date. Accounts over thirty (30) days are subject to 1-1/2 % per month <br />finance charge, 18% APR. Accounts over sixty (60) days are subject to mechanics lien. <br />D.A. Dodd, LLC agrees to provide labor and materials in the most timely manner allowable based upon agreed time frame and <br />available materials with exceptions for occurences beyond the control of D.A. Dodd, LLC. <br />All work to be performed during normal business ours between 7am and 4pm unless otherwise agreed upon. <br />Quote is valid for 10 (ten) days from date of this quote. <br />Labor: $5,280.00 <br />Materials: $3,320.00 <br />Sub-Contractors: $2,300.00 <br />scotth@southbendin.gov <br />DA Dodd proposes to provide labor and materials to perform the above described job. <br />DA Dodd proposes to perform the above described job at the quoted price of : <br />$10,900.00 <br />(Ten Thousand Nine Hundred dollars) <br />GM24-020 <br />1/26/2024 <br />City of South Bend <br />Scott Herczeg Century Center### <br />Mechanical | Plumbing | Sheet Metal <br />14 E. Michigan Street, Rolling Prairie IN 46371 <br />3416 Rascal Drive, Lafayette IN 47909 2516 N. Home Street, Mishawaka IN 46545
The URL can be used to link to this page
Your browser does not support the video tag.