Laserfiche WebLink
ExhibitE <br />SEWER INSURANCE <br />CONTRACTOR RATE SCHEDULE <br />November 8.2016 <br />Pre -qualification category: Second opinion <br />Cable Angering $223.00 Hour <br />Pre-gnalificatlmi category: Excavation <br />Notes: <br />1. Total crew size shall be a maximum of two persons unless otherwise approved by the Sewer <br />Insurance Administrator or representative thereof. <br />2. Equipment costs shall include operator for same. <br />3. Contractor shall invoice all other material used on an itemized basis. <br />4. No rate adjustments shall be made for overtime hours nor fees associated with travel rime. <br />5. There will be no feesassociated with use of pick-up trucks and trailers. <br />Trip Charge for Excavator <br />$334.00 <br />Job <br />Excavator <br />$167.00 <br />Hour <br />Trip Charge for Other Equipment <br />$139.00 <br />Job <br />Rubber tire backhoe <br />$134.00 <br />Hour <br />Mini Excavator <br />$134.00 <br />Hour <br />Air Compressor <br />$123.00 <br />Job <br />Combination Cleaner Truck <br />$334.00 <br />Hour <br />Compactor (hand) <br />$56.00 <br />Job <br />Dump Truck (20 yd) <br />$100.00 <br />Hour <br />F350 Drunp Truck or Similar / Trailer <br />$78.00 <br />Hour <br />Laborer <br />$77,00 <br />Hour <br />Saw Cutting <br />$83.00 <br />Job <br />Trench box, 6' x 6' * <br />$156.00 <br />Job <br />Trench box, 8' x 6' * <br />$334.00 <br />Job <br />Trench box, 10' x 16' * <br />$445,00 <br />Job <br />*When needed, steel sheeting included in cost of bench box. <br />Pre -qualification category: Special <br />Special conditions shall be address by the Sewer Insurance Administrator through City of South Bend <br />emergency contracting procedures. <br />