Laserfiche WebLink
PROJECT NAME: DEMOLITION OF 1000 W. SAMPLE ST. <br />ADDENDUM NO. 1 <br />Date: February 8, 2024 <br />To: All Plan Holders <br />From: Theresa Heffner, Clerk of the Board of Public Works <br />Section 02060 — Building and Site Demolition is to be modified as follows: <br />1.5 Proiect Conditions <br />ADD item BA: All materials resulting from building demolition are to be treated <br />as hazardous. This includes the fire debris in the center of the building, as well as <br />all remaining structural elements, including but not limited to the brick walls, <br />concrete masonry units, roofing materials, foundation walls and footings. <br />ADD item B.5: Contractor shall include a full-time Indiana -licensed Asbestos <br />Inspector to be present on site at all times any work is being performed. There will <br />be no direct payment for this item. Include in the Lump Sum demolition cost. <br />ADD item B.6: Contractor shall include full-time Air Quality Testing to comply <br />with any and all applicable federal, state or local rules, laws, and regulations. There <br />will be no direct payment for this item. Include in the Lump Sum demolition cost. <br />— This addendum consists of a total of 2 pages — <br />Version 8/11/2020 <br />