Laserfiche WebLink
UPD2.11D2.13D2.12A5.1212345678229101111111' - 2"1234' - 9 1/4"CL5' - 2 3/4"1' - 6 1/8"44' - 11"CL4' - 11"18' - 4 7/8"16' - 4 3/8"46' - 5 1/4"5' - 1 7/8"9' - 1 1/2"12' - 2 7/8"5' - 11"5' - 11"12' - 2 7/8"9' - 1 1/2"5' - 1 7/8"16' - 7"13' - 11 3/4"13' - 6 3/8"11' - 11 1/4"3' - 8 1/2"3' - 1"5' - 10 5/8"10' - 4 3/4"1' - 4"3' - 3"TYP.1' - 11 1/2"TYP.1' - 11 1/2"CL1' - 11"CL11' - 3 3/4"CL14' - 0"CL8' - 1 1/2"CL8' - 1 1/2"1. CONTRACTOR TO CAST 16-18 POCKETS INTO FOUNDATION TO ACCOMMODATE HOUSE MOVING STEEL BEAMS. BEAMS TO BE REMOVED ONCE HOUSE IS SET ON NEW FOUNDATION. POCKETS TO BE INFILLED WITH CMU BLOCK. CONTRACTOR TO COORDINATE WITH HOUSE MOVING COMPANY ON FINAL POCKET LOCATIONS.© COPYRIGHT 2024KIL ARCHITECTURE / PLANNINGDATE:Project NumberTHIS DOCUMENT AND THE DESIGN IS THE PROPERTY OF KIL ARCHITECTURE / PLANNING AND THE USE IS LIMITED TO THE SPECIFIED PROJECT. THE ARCHITECT SHALL BE DEEMED THE AUTHOR OF THIS DOCUMENT AND SHALL RETAIN ALL COMMON LAW, STATUTORY AND OTHER RESERVED RIGHTS, INCLUDING THE COPYRIGHT. THIS DOCUMENT MAY NOT BE REPRODUCED, COPIED OR USED WITHOUT THE WRITTEN PERMISSION OF KIL ARCHITECTURE / PLANNING.1126 LINCOLNWAY EASTSOUTH BEND, IN 46601GREGORY A. KILARCHITECTNCARB, AIAPHONE: (574) 288 - 2654www.kilarchitecture.comPRELIMINARYFOR BIDDINGA1.1Construction DocumentsJANUARY 31, 2024KAP. 23022BASEMENT PLANPOLEDORHOUSEMOVE402 W. Navarre StreetSouth Bend, IN 46616BASEMENT PLAN KEYNOTES1NEW STAIR2 NEW STEEL SUPPORT COLUMNS, TYP.3 NEW LVL BEAM BETWEEN COLUMNS, TYP.4 NEW HOT WATER HEATER5NEW CMU CHIMNEY BASE & UNDERSLAB FOOTER.CHIMNEY BASE TO BE FUNCTIONAL FOR NEWBOILER6SOIL STACK: NEW CONNECTION TO EXISTINGSTACK ABOVE7NEW 14" CONCRETE FOUNDATION WALLS JOINEDTO EXISTING, TYP. REFER TO DETAIL 1/A5.1 FORJOIN CONDITION WITH EXISTING8NEW EGRESS WINDOW & WINDOW WELL. 42" SILLHEIGHT, MAX.9NEW CONCRETE FLOOR, FUTURE WALLS &PLUMBING FIXTURES. PROVIDE UNDERSLABPLUMBING CONNECTIONS NO LATER THAN MAY 1,2024 TO ENSURE ADEQUATE SLAB CURING PRIORTO HOUSE MOVE IN JUNE, 202410NEW CONCRETE PATIO, FIBER CEMENT WRAPPEDCOLUMNS & FOOTINGS ABOVE11NEW FIBER CEMENT WRAPPED COLUMNS &FOOTINGS ABOVE12 NEW HOT WATER BOILERSCALE:1/4" = 1'-0"1PROPOSED BASEMENT PLANN02'-0"4'-0"8'-0"SCALE: 1/4" = 1'-0"N02'-0"4'-0"8'-0"SCALE: 1/4" = 1'-0"GENERAL BASEMENT PLAN NOTESNo. Description Date